Introduction
This part of the PTFP website takes you through preparing the reports and other
documents that have to be submitted during the life of your grant, explains how to
request an amendment or extension of your grant if you need one, and summarizes
close-out requirements. Everyone involved with the project in your organization should
know that this information is here and how to find it; you may wish to bookmark this site
to make it easy to find while your grant project is being completed. (You may also
download and print out this material or request printed copies from PTFP.)
In addition, you should read your Department of Commerce Financial Assistance Award
(CD-450) very carefully and keep it handy throughout the Grant Award Period. It includes
important information that does not appear here.
Please note that failing to provide required information on time and in full not only creates
unnecessary problems for your organization, but also puts it out of compliance with the
terms and conditions of the grant award. Being out of compliance can result in
suspension of payments, termination of the award, establishment of an Account
Receivable for any Federal funds paid out to your organization, and denial of grants to
your organization in the future.
Many of the reports and other documents can be prepared and submitted through the
PTFP Online Reporting and Tracking System (PORTS). If you prefer, they may be
prepared and submitted on paper. If you choose paper submission, please be sure to
show the full grant number (e.g., 99-99-N99999) on each document and submit the
documents in duplicate except as noted.
Also, if you choose paper submission, you should be aware that anything sent via the
United States Postal Service — including “overnight” and “Express Mail” — is subject to
delivery delays of up to two weeks because of mail security procedures at the
Department of Commerce. We urge you to consider sending your documents by other
means.
Do not hesitate to contact your PTFP Program Officer whenever you have questions.
The name of your Program Officer is given in the Special Award Conditions of your grant
award document (CD-450); contact information is here.
Many of the requirements for construction grants and planning grants are the same, but
there are differences in how they are prepared and what they include. Please click on
the appropriate link below to take you to the specific requirements for the type of grant
you have.
Construction Grant Reporting Requirements
Planning Grant Reporting
All construction grant recipients must submit a Construction Schedule, Quarterly
Performance Reports, and Financial Status Reports. Preparing them is covered in this
section. Other aspects of administering your grant — Special Award Conditions,
amendments, extensions, etc. — are also covered. Here are links to take you to the
details of preparing the required reports and to other important information:
Housekeeping Items
Construction Schedule
Special Award Conditions
Notes on Competitive Bidding
Quarterly Performance Reports
Financial Status Reports
Labeling Equipment
Amendments
Extensions
Audits
Close-Out Requirements
Where to Send Reports and Requests
While completing your grant, you will have contact with PTFP and the Grants and
Agreements Management Division of the National Institute of Standards and Technology
(NIST). Both are part of the Department of Commerce.
Some of the reports and other documents you have to submit for your grant should be
addressed to your PTFP Program Officer and others to your Grants Specialist at NIST.
As noted, your Program Officer’s name is given in the Special Award Conditions of your
grant award document (CD-450). Your Grants Specialist’s name is also given there with
contact information. Following the directions given here will help to ensure that the
appropriate person sees your submissions as soon as possible.
Your PTFP Program Officer should be the initial contact for all programmatic aspects of
your grant award. The following reports and other documents are submitted to
NTIA/PTFP:
Required from all Construction Grant recipients:
Construction Schedule
Quarterly Performance Reports
If required by a Special Award Condition:
Initial Lien
Insurance Certification
Site Rights Certification
Local Matching Funds Certification
FCC Authorizations
Internal Revenue Service Documents
When required by circumstances as the project is completed:
Amendment Requests
Extension Requests
They should be addressed to:
[Program Officer's Name]
NTIA/PTFP
Room 4812
U.S. Department of Commerce
1401 Constitution Avenue, NW
Washington, DC 20230
______________________
The National Institute of Standards and Technology (NIST) — the Federal Grants Office
— is responsible for all administrative and financial reporting aspects of your grant.
The following should be submitted there:
* Financial Status Report (SF-269)
* Signed copies of the Financial Assistance Award (CD-450)
* Signed copies of an Amendment to the Financial Assistance Award (CD-451)
* Documents to comply with a Special Award Condition on your Financial
Management System (if imposed)
* Executed liens (those that have been filed and stamped in a recording office in
your state after review by PTFP and NIST), if any
They should be addressed to:
[Grants Specialist's Name]
National Institute of Standards and Technology
Grants & Agreements Management Division
100 Bureau Drive, Mail Stop 1650
Gaithersburg, MD 20899-1650
Correct Names and Addresses
You should make sure that the address on file with PTFP and NIST is current and
correct. If you did not do so during the application process, please supply both with a
valid street address for your organization.
If your organization changes the person named in the Financial Assistance Award
(CD-450) as the Contact responsible for administering the grant, be sure to inform PTFP
and NIST of the change immediately and in writing.
Duplicate Copies and Grant Numbers
Except for lien documents, please get in the habit of sending anything submitted to PTFP
in paper form in duplicate!
Please always put your full grant number – e.g., 99-99-N99999 – on anything you send
to PTFP or NIST.
The Construction Schedule is the timetable of how you plan to complete your project. All
equipment must be installed and operational, and all expenditures approved for the
project must be incurred by the end of the Grant Award Period. As you prepare your
Schedule, you should anticipate and allow for normal delays that may happen in a
project of your kind.
You should keep in mind that your project was funded because of the urgency of need
expressed in your application. Completion of the project should reflect the same sense of
urgency. Your organization is expected to begin work on the project promptly and to
complete it within the Grant Award Period specified in the award document.
NTIA has found that the greatest single cause of the inability of grantees to complete
their projects within the authorized Grant Award Period is a delay in starting equipment
procurement. If you anticipate a delay of more than a week or two while equipment is
researched for the writing of bid specifications, you should discuss the matter with your
Program Officer as you prepare your Construction Schedule.
You can prepare and submit your Construction Schedule online through PORTS. It
is due at PTFP thirty (30) days after the start-date on page 1 of your grant award
(CD-450). If you prepare it on paper rather than in PORTS, please send two copies
to PTFP.
Your Construction Schedule must be sufficiently detailed to allow PTFP to be sure that
all necessary steps to complete the project are planned and scheduled. If you prepare
your Construction Schedule online, PORTS provides a matrix to be filled in. The
Schedule should contain projected dates for the following items:
* When advertising for bids on equipment items will begin.
* The deadline for the receipt of bids.
* When purchase orders/contracts for equipment will be issued.
* When installation of equipment will begin.
* When installation will be completed.
* When testing of equipment will begin.
* When testing will be completed.
* When all equipment authorized in the grant will be operational.
* When the following documents will be submitted to NTIA/PTFP if required by
a Special Award Condition in the award document:
o The initial lien (due sixty days after the start of the Grant Award Period).
o Certification of insurance coverage (due sixty days after the start of the
Grant Award Period).
o Attorney's letter certifying the site rights (due six months after the start of the
Grant Award Period; sooner if possible).
o Letter certifying the local matching funds (due six months after the start of the
Grant Award Period; sooner if possible).
o Auditor's certification regarding financial management system (send to
NIST).
o Any document(s) needed to comply with a Special Award Condition that
is unique to your project.
* When any action or activity unique to your project will begin and when it will be
completed.
* When Quarterly Performance Reports will be submitted.
* When Financial Status Reports (SF-269s) will be sent to NIST.
* When the Close-Out will be submitted.
* Any other important information affecting the speedy completion of the
project.
As noted above, you can prepare and submit your Construction Schedule online
through PORTS. If you prepare it on paper, please send it to PTFP in duplicate.
We suggest that you keep a printed copy of your Construction Schedule at hand to
refer to as a checklist as the project proceeds.
Sample Construction Schedule
Anytown State University NTIA/PTFP Grant No. 99-99-N99999
Anytown, State Station WPS (FM)
CONSTRUCTION SCHEDULE
Milestone Date
Project start date 10/01/XX
Submit construction schedule 10/08/XX
Prepare specs for transmitter 11/05/XX
Submit insurance certification 11/10/XX [include only if specified in award
document]
Submit initial lien 11/16/XX [include only if specified in award
document]
Prepare specs for studio equipment 11/19/XX
Request for bids on transmitter 12/14/XX
Request for bids on studio equipment 12/21/XX
Open bids for transmitter 01/18/XX
Submit Quarterly Performance Report 1/21/XX
Open bids for studio equipment 02/04/XX
Award transmitter contract 02/08/XX
Award studio equipment contract(s) 02/22/XX
Special Award Condition: Site Rights 03/20/XX [include only if specified in award
document]
Special Award Condition: Local Match 03/20/XX [include only if specified in award
document]
Mail SF-269 to NIST 04/12/XX
Submit Quarterly Performance Report 04/19/XX
Begin studio equipment installation 04/19/XX
Studio equipment installation completed 05/19/XX
Begin transmitter installation 05/31/XX
Submit Quarterly Performance Report 07/17/XX
Transmitter testing begins 07/26/XX
Transmitter installation completed 08/18/XX
Grant Award Period ends 09/30/XX
Submit Quarterly Performance Report 10/16/XX
Mail final SF-269 to NIST 10/16/XX
Submit Close-Out 12/15/XX
Your award document may contain Special Award Conditions that require the submission
of documents to NTIA/PTFP before Federal funds are released to your organization.
Such Special Award Conditions are generally printed at the end of the award document
and begin: "No funds from the Federal share of this grant award shall be released until
the recipient has submitted to NTIA...".
The most common Special Award Conditions relate to liens, insurance coverage, site
rights, local matching funds certification, FCC authorizations, your organization's financial
management system, and the Internal Revenue Service. These are discussed in order
below, but other Special Award Conditions may be included in the Grant Award as
circumstances require. Please note that the Department of Commerce may impose
Special Award Conditions at any time during the grant award period.
For each Special Award Condition:
* include the Special Award Condition in your Construction Schedule with an
indication of when you expect to meet it, and
* report on your progress in fulfilling the Condition in your Quarterly
Performance Reports.
Note that many of the documents required to meet the Special Award Conditions can be
submitted electronically as attachments in PORTS, via e-mail, or by fax to PTFP
(202-482-2156).
NTIA/PTFP retains a priority reversionary interest in all equipment acquired pursuant to
the project. The interest extends from the beginning of the Grant Award Period through a
ten-year period following the completion of the project. In order to secure the Federal
interest, all construction grant recipients are required to submit lien documents as part of
closing out their grants.
In addition, a Special Award Condition may require your organization to file an initial lien
for your project. If one is required, Federal funds cannot be released until the lien has
been submitted to PTFP, approved by NIST, filed as your state requires, and a certified
copy returned to NIST.
When an initial lien is required for a PTFP project, it is usually requested in a Special
Award Condition placed in the award document and stated in language similar to the
following:
No funds from the Federal share of this grant award shall be released until the recipient has
executed and recorded a document establishing that the Federal government has a priority
lien on any facilities purchased with funds under this award during the period of continuing
Federal interest.
Most grant recipients use a UCC-1 (Uniform Commercial Code) financing statement. A
chattel mortgage may also be used. UCC-1 forms differ slightly from state to state. They
are usually available from an attorney, a bank's loan department, or an office supply
store. They are available online in some states. (If your state requires liens to be filed in
more than one recording office, be sure you prepare the appropriate number of forms to
send to PTFP.)
Completing the UCC-1
Enter your organization's name and address as the "Debtor". Enter the following in the
section for the "Secured Party":
NTIA/PTFP
Room 4812
U.S. Department of Commerce
1401 Constitution Avenue, NW
Washington, DC 20230
In the section designated for the description of the items covered by the lien, enter the
following:
This financing statement covers all equipment to be acquired under National
Telecommunications and Information Administration Grant No. [enter complete grant
number; e.g., 99-99-N99999]. A copy of the project's equipment list is attached and is
incorporated into this lien by reference. The term of this priority lien shall extend for a
period of ten years following [fill in the project expiration date from the face sheet of the
award document], during which time the Federal Government retains a priority
reversionary interest in the equipment on the attached list.
Attach a copy of the approved equipment list from your award document. If a signature is
required by your state, the lien document should be signed as the "Debtor" by your
organization's Certifying Representative and sent to your Program Officer at the address
shown here.
PTFP will review the lien and forward it to NIST. NIST will sign the lien form for the
"Secured Party" — if a signature is required — and return it to you for filing as specified
by your state’s law. (Note that the lien form must be sent to PTFP before you file it,
even if your state’s form does not require the Secured Party to sign it.)
A copy of the filed lien, with the recording office stamp clearly visible, must be returned
promptly to your Grants Specialist at the address shown here.
Additional Liens
You may be required to provide revised liens prior to the completion of your project if
your grant award is amended to include additional or materially different equipment. In
many jurisdictions, the lien can be revised by executing an amendment to the original
UCC-1. The forms to amend the original filing have different designations in various
jurisdictions. In many states, the amendment version is called a UCC-2 or a UCC-3.
Follow the same procedures to file a revised UCC form as outlined for the initial lien.
All grantees are required to maintain adequate insurance coverage on the equipment
purchased under a PTFP grant so that, in the event of loss, they will be able to continue
the project by promptly replacing equipment.
Some grant awards include a Special Award Condition for insurance coverage. If yours
does, your organization must certify that all equipment to be purchased with PTFP funds
will be insured. When an insurance certification is required for a PTFP project, the
Special Award Condition is usually stated in language similar to the following:
No funds from the Federal share of this grant award shall be released until the recipient has
certified that the grantee maintains protection against common hazards through adequate
insurance coverage or other equivalent undertaking, except that, to the extent the grantee
follows a different policy of protection with respect to its other property, the grantee may
extend such policy to apparatus acquired and installed under the project. The grantee shall
certify that it has purchased flood insurance (in communities where such insurance is
available) if the facilities will be constructed in an area that has been identified by the
Federal Emergency Management Agency as having special flood hazards. Certification
shall be in the form of a letter signed by the Chief Executive Officer, Chief Financial
Officer, or Risk Manager of the recipient organization.
Send the certification to your Program Officer at the address shown here.
As indicated in the section on liens, the Federal government has an interest in
PTFP-funded equipment for ten years after the completion of a project. To ensure that
inadequate site rights will not hinder a grantee's ability to provide long-term public
telecommunications services, NTIA requires grantees to have adequate rights to each
site on which such items of major fixed equipment as a broadcast transmitter or a tower
are or will be installed. Some grant recipients are required by NTIA/PTFP to provide
evidence of leases or ownership of such sites.
When site rights certification is required for a PTFP project, it is requested in a Special
Award Condition placed in the award document and stated in language similar to the
following:
No funds from the Federal share of this grant award shall be released until the recipient
provides to NTIA an opinion letter from its attorney describing the ownership or leasehold
interest the recipient has in all sites on which the recipient will locate major fixed
equipment, such as broadcast transmitters or towers (whether or not funded by this grant
project). The attorney's opinion letter shall comply with the requirements provided by the
NTIA. If the recipient fails to submit the required certification letter by [date], this grant
award may be terminated.
As stated in the Special Award Condition, if the required attorney's letter regarding the
site rights is not submitted to NTIA/PTFP in final form by the deadline stipulated, the
grant award may be terminated. Grantees should work with their local attorneys to
develop acceptable lease or ownership agreements. NTIA expects grantees to have at
least the following for a ten-year period at each site involved:
1. The right — whether by fee simple title, long-term lease, or the
option or rights of renewal to obtain the same — to occupy the site(s).
2. The right to construct, maintain, operate, inspect, and remove the project
equipment without any impediments in the site contract(s) or local zoning
laws, or any other known impediments.
In addition, nothing under local law or enforceable contract should prevent the Federal
government from entering the property and reclaiming or securing grant-funded property.
Exceptions
The letter should address specifically any exceptions to the general provisions above and
to the statements in the sample letter below. It should identify and fully explain any
circumstances that support the conclusion that those exceptions do not materially
interfere with the grantee's and the Federal government's ability to protect the grant
property and the continued operation of the project for the duration of the Federal
interest period.
If your rights are subject to restrictions that might prevent occupancy for the full ten-year
period, your counsel must certify that the Federal interest in the equipment is fully
protected. For example, a lease may allow the lessor to terminate occupancy in certain
events (non-payment or other default), or its term may be less than the full ten years
(without a renewal clause). In these situations, counsel must certify that:
(a) If the lease allows the lessor unilaterally to terminate the lease for cause and evict
the lessee, the lessor must provide adequate advance notice in writing of such
action. Preferably, the lease will provide reasonable opportunity to "cure"
problems, and sufficient time to relocate the facilities without a break in the
broadcast service. The requisite period of time may vary with the nature of the
facility and local real estate market, but the advance notice period would typically
be 60 to 120 days.
(b) A lessor's lien, if any, on the grant-funded property remains subordinate to the
Federal lien on the property. A lessor's right, if any, to remove property in an
eviction situation is subject to an obligation to hold and to protect that property for
disposition by the Federal government.
(c) If the lessor has rights that exceed those outlined in (a) or (b), above, or has other
rights that interfere with the operation of the project (such as termination of
needed services), local law or enforceable contract ensures that these rights are
exercised reasonably. Reasonableness includes adequate prior notice to the
grantee and cooperation or consultation with the grantee to minimize damages.
A SUGGESTED LETTER OF CERTIFICATION
(ATTORNEY LETTERHEAD)
NTIA/PTFP Grant No.: 99-99-N99999
I, (attorney name), certify that I am legal counsel to (grantee name) and that it has major
fixed equipment at the following site(s):
Site Use of Site Status Lessor Name
[Transmitter, microwave, etc.] [Own, lease, option]
I recognize that the Federal Government has an interest in the project from the award
date through a period ten years after project completion. For [each of] the above site[s], I
certify that, during the Federal interest period:
1. The grantee has the right by [fee simple title, long-term lease, or
the option or rights of renewal to obtain the same] to occupy the above site[s]
2. The grantee's right to construct, maintain, operate, inspect, and remove the
project equipment is not subject to any impediments in the site contract[s] or
local zoning laws, or any other known impediments.
3. Under local law or enforceable contract, nothing prevents the Federal
government from entering the property and reclaiming or securing
grant-funded property.
[Discussion of any possible exceptions].
Signature of legal counsel
We would like to emphasize what is NOT necessary. NTIA does not require that the recipient's
attorney conduct a title search. Nor does NTIA expect that the attorney will perform research into
the real estate laws and zoning regulations of the communities in which the project's major fixed
equipment is located. In fact, no special research should be required to satisfy this Special Award
Condition. NTIA merely expects that the attorney will read carefully the site document in question
and, based upon that reading, determine whether the document conforms to NTIA's
requirements. Attorneys may, if they wish, state the limitations of their research in the opinion
letter.
Some grant awards include a Special Award Condition for the local share of the project’s
total project cost. If your award does, your organization must certify — normally within
six months of the project start date — that the required local matching funds are in hand.
When this certification is required, the Special Award Condition is usually stated in
language similar to the following:
No funds from the Federal share of this grant award shall be released until the recipient has
certified to the NTIA that it has the non-Federal share in hand. If the recipient is not able
to certify that the entire non-Federal share of this grant is available by [date], this grant
award may be terminated. Certification shall be in the form of a letter signed by the Chief
Executive Officer, Chief Operating Officer, or Chief Financial Officer of the recipient
organization.
The local funds must be available to be expended when the certification is made to NTIA
because Federal regulations require grant recipients to expend the local matching share
of the total project funds simultaneously with the Federal share, in the proportion of the
grant. For example, if the Federal and local shares of your project are each 50%, you
must spend a local dollar for each Federal dollar you spend.
The letter of certification should be sent to your Program Officer at the address shown
here. Please submit two copies.
If your project requires authorization from the Federal Communications Commission
before it can be built and you did not have that authorization in hand when your PTFP
application was negotiated, a Special Award Condition was imposed stating that no
Federal funds can be released until the necessary authorization has been issued and
copies supplied to NTIA/PTFP. When a project is very large and requires a number of
FCC authorizations, the Special Award Condition may be worded to allow Federal funds
to be released for parts of the project as the various authorizations are issued by the
Commission.
You should keep your PTFP Program Officer informed about the status of your FCC
application and any actions the Commission takes apart from issuing a required
authorization. Please note, however, that NTIA/PTFP cannot intervene on behalf of your
organization with the FCC.
Send the copies of FCC documents to your Program Officer at the address shown here.
This condition — imposed by NIST — requires that a Certified Public Accountant certify
that your organization's financial management system meets the requirements and
standards prescribed in 15 CFR Part 14, Subpart C, Section 14.21. The certification
should be sent to your Grants Specialist at NIST at the address shown here, not to your
Program Officer.
If the Internal Revenue Service (IRS) had not ruled on your organization's non-profit
status when you submitted your PTFP application or when that application was
negotiated, a Special Award Condition was imposed:
No funds from the Federal share of this grant shall be released until the recipient has
submitted to the NTIA a copy of the Internal Revenue Service certification of its non-profit
status.
To meet this condition, send your Program Officer two copies of the IRS certification at
the address shown here.
All acquisitions made as part of an NTIA/PTFP grant must be done through open
competitive bidding. As the Office of Management and Budget puts it, "All procurement
transactions shall be conducted in a manner to provide, to the maximum extent practical,
open and free competition." NTIA strongly urges you to avoid time-consuming and costly
disputes with potential contractors and vendors by familiarizing yourself with the rules
and procedures governing competitive bidding. Among the many points to consider are
the following:
* In the award document, the Special Award Condition on “Pre-Award and
Procurement Documents.”
* Read carefully--and have your procurement officer read carefully--the rules
and regulations about competitive bidding of both your state and the Federal
government. Federal purchasing regulations are contained in 15 CFR 24,
which was included in the packet of award documents. If you do not have
copies of these regulations, make certain that you acquire and read them
before you put any items out to bid.
* You may not subgrant any funds or contract with any organization that has
been excluded from, or is ineligible for, participation in Federal assistance
programs. The Federal Excluded Parties System can be accessed at
www.epls.gov.
* When you purchase any item as part of the grant project, be certain that you
follow all Federal procurement guidelines, as well as any state guidelines and
procedures to which your organization is subject.
* Take special care to make clear to prospective bidders the code of standards
they are to follow, as spelled out in the OMB circular.
* All procurement transactions must be handled competitively. Practices that
may result in restrictive bidding include the following:
o placing unreasonable requirements on prospective bidders;
o requiring unnecessary experience or excessive bonding;
o engaging in organizational conflicts of interest; and
o specifying a brand name product, or describing the item to be procured in
such a way that all but one manufacturer are excluded. When a "brand
name or equal" description is used, the specifications should state the
specific features of the brand name product that bidders must meet.
** Specifications are best set forth in terms of functions to be performed or the
performance required. Specifications probably are restrictive if they specify how a
given function must be carried out and only one manufacturer's equipment does it
that way. Copying specifications supplied by a vendor or manufacturer is almost
certain to provoke a bid protest unless that vendor or manufacturer is excluded
from bidding. A bid protest can result in a time-consuming, lengthy delay in
completing your grant project and may cause a delay in your ability to draw grant
funds. Awarding a purchase contract to the low bidder does not "prove" that
restrictive bid specifications were not used.
* Maintain detailed records relating to all procurement. Be especially careful
to document:
o the rationale for the procurement,
o the reason why a particular bid was rejected, and
o the reason why a particular bid was accepted.
* In the event of a protest on any bid specification, make certain that you are
aware of all the local administrative remedies available to you within your
organization and state for resolving bid protests.
Please do not automatically refer bid protests to the Federal government for resolution.
The Federal government limits its role in resolving bid protests to cases in which
violations of Federal law or regulations have occurred, and/or the recipient's organization
has failed to review the complaint properly.
It is your responsibility to learn what you can and cannot do with regard to bidding
procedures.
Quarterly Performance Reports (sometimes called Quarterly Technical Reports) are due
at PTFP within thirty days after the end of each calendar quarter. The Reports let PTFP
and NIST follow your progress in completing your project.
The dates the Quarterly Performance Reports are due at PTFP are as follows:
For the Quarter Your report is due at PTFP
October 1 to December 31 no later than January 31
January 1 to March 31 no later than April 30
April 1 to June 30 no later than July 31
July 1 to September 30 no later than October 31
The Construction Schedule submitted at the start of the project should serve as the
matrix for your Reports whether prepared online through PORTS or on paper. As shown
in the sample below, if dates on your Construction Schedule are not met, you should
show a revised date in the column provided with an explanation of any substantial
revision in the narrative.
Reports submitted on paper should show the complete PTFP grant number, be identified
as a Quarterly Performance Report, and state the reporting period. Reports are expected
to include the following:
* Comparison of actual accomplishments during the reporting period with the
goals established in the Construction Schedule for that reporting period.
* Description of any problems that have arisen or reasons why the established
goals have not been met.
* Actions taken to remedy any failures to meet goals.
* List of equipment purchased during the reporting period compared with the
equipment authorized in the award document. This information should
include:
o brief description of each item,
o manufacturer and model number,
o quantity of each item purchased, and
o cost.
As indicated, your Quarterly Performance Report should include a list of the equipment
purchased through the current quarter compared with the equipment authorized in the
grant. Online, PORTS supplies the list. The left-hand column shows what was
authorized. You should use the right-hand column to supply information on the
equipment actually purchased as you acquire it. The list should be cumulative so that it
shows NTIA/PTFP all that has been acquired through the current Quarterly Performance
Report. If you prepare your Report on paper, you should utilize the actual equipment
pages from the award document. (See an example here)
While the equipment list and narrative should reflect the current status of the project,
NTIA is not seeking a complete history of the project in each quarterly report. When you
address pending issues from prior quarters, you should condense the prior information
and emphasize the updated material.
Using the format shown here will help you, your Program Officer, and your Grants
Specialist follow your progress in completing the project.
Sample Quarterly Performance Report
Anytown State University NTIA/PTFP Grant No. 99-99-N99999
Anytown, State Station WPS (FM)
Quarterly Performance Report
Period Ending March 31, 20XX -
Prepared April 19, 20XX
Performance Report Summary
The March 4th flood took out a bridge over Yellow Creek leading to the transmitter site. Truck
delivery of the new transmitter will be impossible until the bridge is repaired. We are in contact
with the Highway Department about the situation, and a local National Guard Combat
Construction Unit may be able to arrange delivery by helicopter for us to complete the work on
schedule.
Apart from the bridge outage, the project is essentially on schedule, and we have every
expectation that it will be completed by the end of the Grant Award Period. The situation with
access to the transmitter site is serious and could result in a project delay. There is still time for
the bridge repairs, however, and talks with the National Guard unit are very positive as to its
being able to help us – in fact, it appears eager to do so as a training exercise and is hoping that
the Highway Department will be unable to repair the bridge in time!
Original Revised Completed
Milestone Date Date Date
Project start date 10/01/XX 10/01/XX
Mail construction schedule 10/09/XX 10/09/XX
Submitted Amendment Request 10/09/XX
Submit insurance certification 11/10/XX 11/12/XX
Submit initial lien 11/16/XX 11/17/XX
Prepare specs for transmitter 11/05/XX 11/19/XX 11/16/XX
Amendment request approved 11/27/XX
Prepare specs for studio equipment 11/19/XX 11/30/XX
Request for bids on transmitter 12/14/XX 12/28/XX 12/24/XX
Request for bids on studio equipment 12/21/XX 12/28/XX
Open bids for transmitter 01/18/XX 01/28/XX
Submit Quarterly Performance Report 01/21/XX 01/21/XX
Open bids for studio equipment 02/04/XX 02/08/XX.
Award transmitter contract 02/08/XX 02/15/XX
Award studio equipment contract(s) 02/22/XX 02/29/XX 03/01/XX
Special Award Condition: Site Rights 03/20/XX 03/20/XX
Special Award Condition: Local Match 03/30/XX 02/25/XX
Mail SF-269 to NIST 04/12/XX
Submit Quarterly Performance Report 04/19/XX
Begin studio equipment installation 04/19/XX 04/28/XX
Studio equipment installation complete 05/19/XX
Begin transmitter installation 05/31/XX 06/14/XX
Submit Quarterly Performance Report 07/17/XX
Transmitter testing begins 07/26/XX
Transmitter installation completed 08/18/XX
Grant Award Period ends 09/30/XX
Submit Quarterly Performance Report 10/16/XX
Mail final SF-269 to NIST 10/16/XX
Submit Close-Out 12/15/XX
Equipment list is attached.
[signature]
Richard Who
Station Manager
NOTE: If you prepare your Report on paper, the summary may be placed after the
milestones. Send two copies of the Quarterly Performance Report to your
Program Officer at the address shown here.
An example of the equipment list that accompanies a Quarterly Performance Report is
here.
You must submit a Financial Status Report (SF-269) to NIST for the six-month periods
ending March 31 and September 30, or any portion thereof whether there was any
financial activity or not. The reports are due no later than April 30 and October 31,
respectively. A final Financial Status Report must be submitted within ninety days after
the expiration of the Grant Award Period. If your PTFP Grant Award Period began on
October 1, your first Financial Status Report is for the period ending March 31.
Please note carefully: Failure to submit the required financial status reports on time or
to respond promptly to requests or inquiries from NIST may result in (1) the temporary
suspension of the ability to draw down grant funds or (2) suspension of the Grant Award
for non-compliance with the terms and conditions of the grant.
Financial Status Report forms (SF-269) are included in your award documents.
Completed reports should be sent to NIST at the address shown here. Questions
about completing the SF-269 should be directed to your Grants Specialist.
You must mark permanently all equipment included in the project to ensure accurate
identification and accurate reference to inventory records.
A non-removable label (or other means of identification) should be attached to the
equipment where it can be seen easily. The label should contain your organization's
inventory number plus the last five digits of the NTIA/PTFP grant award number.
Transmission antennas should be assigned an inventory number. It should be posted in
the transmitter shelter with an appropriate identification.
Your organization has been awarded a PTFP grant to purchase a specific number of
specific items of equipment at an agreed-upon Total Project Cost. If the project can be
completed for less than the cost estimated in the award document, then both your
organization and the Federal government have saved money. (Funds returned to PTFP
in this way are awarded as grants in subsequent grant rounds.)
After purchasing and installing all equipment on the approved equipment list you are
NOT authorized to spend any remaining Federal funds. Similarly, if the approved
equipment list includes two Acme 1400's and they actually cost only half of what was
expected, you are NOT authorized to buy three or four as part of the grant project.
Amending an Award
Changes or additions can be made to the approved equipment list only with prior written
approval from PTFP. No matter what anyone may say, if you do not receive written
approval from PTFP, the request for an amendment has not been approved.
Requests for amendments must be submitted in writing to PTFP through PORTS or on
paper. The request cannot be combined with a Quarterly Performance Report, an
extension request, nor any other submission. The request should state clearly what
changes you wish to make and the reasons for them. All relevant cost figures must be
included. We suggest that you first call your Program Officer and discuss the need for
amending the grant award. If submitted on paper, the request should be clearly
identified as an Amendment Request.
Amendments may be approved if they are integral to, and within the scope of, the
originally approved project. Requests that would result in the expansion of the scope of
the project as awarded usually will not be approved. Requests will be reviewed to
determine whether the amendment is the result of changes in engineering approach,
desire to implement new technology, or is necessary for the operation of equipment
originally approved in the grant.
Your written amendment request should contain a statement along the following lines:
The changes requested in this amendment will be accomplished at no additional cost to the
Federal government. Any increase in the total cost of the project caused by the requested
amendment will be covered from local funding sources.
Or:
We have tentatively identified some funds within the grant that may be available to help
with this change, but we are prepared to pay any increase in the total cost of the project
from local resources and the change will be accomplished at no additional cost to the
Federal government.
When an Amendment Is Not Required
NTIA expects that, as a result of the competitive bidding process, there will be
differences in manufacturer and/or model number in the equipment purchased versus
the equipment approved in the award document. There probably will also be some minor
fluctuation in prices. Amendments for these changes are not necessary as long as the
equipment purchased is equivalent in quantity and quality to what appears in the
award document equipment list. Please contact your Program Officer if you have specific
questions.
Unauthorized Expenditures
Equipment that does not appear in the award document or has not been the subject of
an approved amendment will be removed from the project by NTIA/PTFP at close-out. If
this occurs you may be required to refund Federal funds previously paid to your
organization.
The Grant Award Period is the time during which your organization can obligate Federal
funds to complete the approved project. The Grant Award Period for your grant appears
on the first page of the award document. All Federal funds must be obligated and all
equipment must be installed and operational by the end of the Grant Award Period.
Requests for extensions must be submitted in writing to PTFP through PORTS or on
paper. The request cannot be combined with a Quarterly Performance Report, an
amendment request, or any other submission. An extension request should reach
PTFP at least three weeks before the end of the Grant Award Period. This will allow your
request to be given full consideration before the Grant Award Period expires. Before
submitting your request, NTIA suggests that you call your Program Officer and discuss
the need for extending the Grant Award Period. If submitted on paper, the request
should be clearly identified as an Extension Request.
Your request should be supported by a full explanation of what has happened to make
an extension necessary. Generally PTFP looks for causes beyond the grantee's control,
such as failure of a vendor to meet delivery dates, and it may request supporting
documentation (copies of correspondence, etc.) to accompany the request. It does not
look favorably on simple inactivity on the part of the grantee. After reviewing it, PTFP
forwards the request to the NIST with a recommendation for approval or denial.
If you do not receive written approval from NIST, the request for an extension has
not been approved.
Extensions of the Grant Award Period will usually be for three, six, nine, or twelve
months.
Non-profit organizations, government agencies, Indian tribes, and educational institutions
expending more than $500,000 in Federal funds from all sources during a one-year
period are required to have an audit conducted in accordance with Federal guidelines as
stated in OMB Circular A-133, dated June 30, 1997 (if you do not have a copy, you can
get one by going to www.whitehouse.gov/omb and clicking on <Circulars>). These audits
are performed in one of two ways. An NTIA/PTFP-specific audit may be performed if the
organization receives Federal funds solely from NTIA. If the organization receives funds
from more than one Federal source during the year that the audit is conducted, an
organization-wide audit must be performed. Note that Corporation for Public
Broadcasting (CPB) funding is not considered a Federal source.
In brief, OMB Circular A-133 requires that all such recipients obtain regular audits,
preferably annually, but at least once every two years. Copies of the audits must be
provided to each Federal agency that provides funds to your organization. The copy of
the audit reports to be provided to the Department of Commerce should be sent to the
following address:
Mr. William F. Bedwell. Jr.
Office of Audits - Regional Audits
Office of Inspector General
U.S. Department of Commerce, Suite 2342
401 West Peachtree Street, NW
Atlanta, GA 30365
No matter which Federal agency is officially to receive the audit, all PTFP grant recipients
should send a copy of the audit transmittal letter to their NIST Grants Specialist.
Audits performed in response to CPB qualification requirements will not necessarily
conform to the Federal government auditing standards required by Circular A-133. The
CPB requires a "standard" financial statement audit. While such an audit will certainly
serve as the basis for the A-133 audit, further tests of the accounting records will have to
be completed in order to bring the audit into compliance with A-133. We urge you to
review the A-133 requirements with your accountant as early as possible.
** Grantees should review Section D of the Department of Commerce Financial
Assistance Standard Terms and Conditions. Section D discusses audits. Any
questions about audits should be directed to NIST.
You are required to provide PTFP with full close-out documentation for your project
within ninety days following project completion or the expiration of your Grant Award
Period, whichever comes first. As the closing date of your award approaches, you will
receive a reminder e-mail from NTIA/PTFP. It will direct you to the Close-Out
Requirements section of this website, which contains complete instructions to assist you
in preparing your close-out. If you complete your project early, you should proceed to that
website without waiting for the reminder because the 90-day close-out period starts at
the end of the month in which construction of your project is completed and the
equipment is operational.
It is essential that you maintain careful records throughout the award period and that you
respond promptly to the close-out instructions so that you do not encounter unnecessary
delays in preparing your close-out materials.
Click here for complete Close-Out instructions and guidance.
Your organization’s responsibility to the Federal government through the Department of
Commerce does not end when NIST informs you that your Close-Out has been
accepted. For details of the post-project responsibilities, click here.
NOTICE
We have estimated that each response to this collection of information will take on
average 14 hours for grant recipients to prepare the construction schedule and the
quarterly performance reports. Our estimates include the time to read the instructions,
look through existing records, gather and maintain required data, and actually complete
and review the response. If you have any comments on this estimate or on how we can
improve the collection and reduce the burden it causes you, please write to the Office of
Policy Coordination and Management, NTIA, Room 4892, Department of Commerce,
Washington, DC 20230. Your comments will also be accepted via the Internet if you send
them to ptfp@ntia.doc.gov. You are not required to respond to a collection of information
sponsored by the Federal government, and the government may not conduct or sponsor
this collection, unless it displays a currently valid OMB control number or if we fail to
provide you with this notice.
OMB Approval No. 0660-0001 — Expires September 30, 2009
All planning grant recipients must submit a Project Schedule, Quarterly Performance
Reports, and Financial Status Reports. Preparing them is covered in this section. Other
aspects of administering your grant — Special Award Conditions, amendments,
extensions, etc. — are also covered. Here are links to take you to the details of
preparing the required reports and to other important information:
Housekeeping Items
Where to Send Reports and Requests
Correct Names and Addresses
Duplicate Copies and Grant Numbers
Project Schedule
Special Award Conditions
Consultants/Contractors
Certification of Local Matching Funds
Financial Management System
Internal Revenue Service
Notes on Competitive Bidding
Quarterly Performance Reports
Financial Status Reports
Amendments
Extensions
Audits
The Final Report
Close-Out Requirements
Where to Send Reports and Requests
While completing your grant, you will have contact with PTFP and the Grants and
Agreements Management Division of the National Institute of Standards and Technology,
(NIST). Both are part of the Department of Commerce.
Some of the reports and requests you have to prepare for your grant should be
addressed to your PTFP Program Officer and others to your NIST Grants Specialist. As
noted, your Program Officer’s name is given in the Special Award Conditions of your
grant award document (CD-450). Your Grants Specialist’s name is also given there with
contact information. Following the directions given here will help to ensure that the
appropriate person sees your submissions as soon as possible.
Your PTFP Program Officer should be the initial contact for all programmatic aspects of
your grant award. The following reports and other documents are submitted to
NTIA/PTFP:
Required from all Planning Grant recipients:
Project Schedule
Quarterly Performance Reports
When required by a Special Award Condition:
Consultants/Contractors
Certification of Local Matching Funds
Internal Revenue Service Certification
When required by circumstances as the project is completed:
Amendment Requests
Extension Requests
They should be addressed to:
[Program Officer's Name]
NTIA/PTFP
Room 4812
U.S. Department of Commerce
1401 Constitution Avenue, NW
Washington, DC 20230
______________________
The National Institute of Standards and Technology (NIST) — the Federal Grants Office
— is responsible for all administrative and financial reporting aspects of your grant.
The following should be submitted there:
* Financial Status Report (SF-269)
* Signed copies of the Financial Assistance Award (CD-450)
* Signed copies of an Amendment to the Financial Assistance Award (CD-451)
* Documents to comply with a Special Award Condition on your Financial Management
System (if imposed)
They should be addressed to:
[Grants Specialist's Name]
National Institute of Standards and Technology
Grants & Agreements Management Division
100 Bureau Drive, Mail Stop 1650
Gaithersburg, MD 20899-1650
Correct Names and Addresses
Please make sure that the address on file with PTFP and NIST is current and correct. If
you did not do so during the application process, please supply both with a valid street
address for your organization.
If your organization changes the person named in the Financial Assistance Award
(CD-450) as the Contact responsible for administering the grant, be sure to inform PTFP
and NIST of the change immediately and in writing.
Duplicate Copies and Grant Numbers
Please get in the habit of sending anything submitted in paper form to PTFP in
duplicate!
Please always put your full grant number — e.g., 99-99-N99999 — on anything you
send to PTFP or NIST.
The Project Schedule is modeled on the Construction Schedule, except that the items
listed relate to the steps in the specific planning process, timetable, and activities
required to meet the objectives of the grant award. All approved activities and
expenditures must be completed by the end of the Grant Award Period.
Your grant application identified your project's major objectives and procedures and
provided a preliminary project timetable. NTIA suggests that you reiterate and keep in
mind the specific objectives for your project as you revise and outline the planning
process in a revised Project Schedule to accomplish your project objectives within the
award period, including step-by-step procedures and when you expect activities to be
completed. You should contact your Program Officer if you have questions regarding the
Project Schedule.
As you prepare your Schedule, you should keep in mind that your project was funded
because of the urgency expressed in your application. Completion of the project should
reflect the same sense of urgency. Your organization is expected to begin work on the
project promptly and to complete it within the Grant Award Period specified in the award
document.
You can prepare and submit your Project Schedule online through PORTS. It is
due at PTFP thirty (30) days after the start-date on page 1 of your grant award
(CD-450). If you prepare it on paper rather than in PORTS, please send two copies
to PTFP.
Your Project Schedule must be sufficiently detailed to allow PTFP to be sure that all
necessary steps to complete the project are planned and scheduled and also to allow it
to track progress as the project goes forward. If you prepare your Schedule online,
PORTS provides a matrix to be filled in. The Schedule should contain projected dates for
the following items:
* When development of survey materials and forms will begin.
* When local advisory committee meetings will begin.
* When advertising for Requests for Proposals (RFPs) from contractors will
begin.
* The deadlines for the receipt of proposals.
* When contracts for contractors/consultants will be issued.
* When onsite visits will be held.
* When any surveys will be completed.
* When ongoing meetings will all parties will take place.
* When the following documents will be submitted to NTIA/PTFP if required by
a Special Award Condition in the award document:
o Resumes from consultants and contractors.
o Letter certifying the local matching funds (due six months after the start of the
Grant Award Period; sooner if possible).
o Auditor's certification regarding financial management system (send to
NIST).
o Any document(s) needed to comply with a Special Award Condition that
is unique to your project.
* When Quarterly Performance Reports will be submitted.
* When Financial Status Reports (SF-269s) will be submitted to NIST.
* When the Close-Out will be submitted.
* Any other important information affecting the speedy completion of the
project.
As noted above, you can prepare your Project Schedule online through PORTS. If
you prepare it on paper, please send it to PTFP in duplicate.
We recommend that you keep a printed copy of your Schedule at hand to refer to
as a checklist as the project proceeds.
Anytown Foundation, Inc. NTIA/PTFP Grant No. 99-99-N99999
Anytown, State
Project Schedule
Milestone Date
Project start date 10/01/XX
Submit Project Schedule 10/08/XX
Prepare RFPs for consultants 10/15/XX
Request proposals from consultants 10/19/XX
Develop survey methods 10/22/XX
First meeting of the Advisory Committee 11/08/XX
Open proposals from consultants 11/19/XX
Special Award Condition: Consultants 11/24/XX [include only if specified in
award document]
2nd meeting of the Advisory Committee 12/12/XX
Award consultants’ contracts 12/15/XX
First meeting with technology consultant 12/28XX
Distribute survey materials 01/08/XX
Submit Quarterly Performance Report 01/21/XX
3rd meeting of the Advisory Committee 02/12/XX
Special Award Condition: Local Matching [include only if specified in
Funds 03/31/XX award document]
Review and analyze survey results 04/10/XX
Meeting of the Advisory Committee to discuss
survey results 04/15/XX
Mail SF-269 to NIST 04/19/XX
Submit Quarterly Performance Report 04/19/XX
Schedule additional meetings with all parties 04/19/XX
Begin onsite visits 05/19/XX
Review technological options with
technology consultant 06/15/XX
Submit Quarterly Performance Report 07/17/XX
Review and analyze research findings
and technological recommendations 08/10/XX
Begin drafting Final Report 08/14/XX
Advisory Committee meeting to
approve Final Report 09/20/XX
Grant Award Period ends 09/30/XX
Submit Quarterly Performance Report 10/16/XX
Mail final SF-269 to NIST 10/16/XX
Submit Close-Out, including Final Report 12/15/XX
Your award document may contain Special Award Conditions that require the submission
of documents to NTIA/PTFP before Federal funds are released to your organization.
Such Special Award Conditions are generally printed at the end of the award document
and begin: "No funds from the Federal share of this grant award shall be released until
the recipient has submitted to NTIA...".
The most common Special Award Conditions relate to consultants and/or contractors,
local matching funding, your organization's financial management system, and the
Internal Revenue Service. These are discussed below, but other Special Award
Conditions may be included in the Grant Award as circumstances require. Please note
that the Department of Commerce may impose Special Award Conditions at any time
during the grant award period.
For each Special Award Condition:
* include the Special Award Condition in your Project Schedule with an
indication of when you expect to meet it, and
* report on your progress in fulfilling the Condition in your Quarterly
Performance Reports.
Many planning projects make use of consultants or contractors to perform some or all of
the studies required for the project. If this Special Award Condition is included in your
Grant Award, two copies of the resume(s) and/or proposal(s) of any such consultants
and contractors must be submitted to NTIA/PTFP for approval before the project may
proceed. The materials should be sent to your PTFP Program Officer at the address
shown here. Approval is not official until you receive it in writing from the Grants
Officer.
Please note that this condition is in addition to the consultant/contractor requirement
stated in applicable OMB circulars.
Some grant awards include a Special Award Condition for the local share of the project’s
total project cost. If your award does, your organization must certify — usually within six
months of the project start date — that the required local matching funds are in hand.
When this certification is required, the Special Award Condition is usually stated in
language similar to the following:
No funds from the Federal share of this grant award shall be released until the recipient has
certified to the NTIA that it has the non-Federal share in hand. If the recipient is not able
to certify that the entire non-Federal share of this grant is available by [date], this grant
award may be terminated. Certification shall be in the form of a letter signed by the Chief
Executive Officer, Chief Operating Officer, or Chief Financial Officer of the recipient
organization.
The local funds must be available to be expended when the certification is made to NTIA
because Federal regulations require grant recipients to expend the local matching share
of the total project funds simultaneously with the Federal share, in the proportion of the
grant. For example, if the Federal and local shares of your project are each 50%, you
must spend a local dollar for each Federal dollar you spend. The letter of certification
should be sent to your Program Officer at the address shown here. Please submit two
copies.
This condition — imposed by NIST — requires that a Certified Public Accountant certify
that your organization's financial management system meets the requirements and
standards prescribed in 15 CFR Part 14, Subpart C, Section 14.21. The certification
should be sent to your Grants Specialist at NIST at the address shown here, not to your
Program Officer.
If the Internal Revenue Service (IRS) had not ruled on your organization's non-profit
status when you submitted your PTFP application or when that application was
negotiated, a Special Award Condition was imposed:
No funds from the Federal share of this grant shall be released until the recipient has
submitted to the NTIA a copy of the Internal Revenue Service certification of its non-profit
status.
To meet this condition, send your Program Officer two copies of the IRS certification at
the address shown here.
All acquisitions made as part of an NTIA/PTFP grant must be done through open
competitive bidding. As the Office of Management and Budget puts it, "All procurement
transactions shall be conducted in a manner to provide, to the maximum extent practical,
open and free competition." NTIA strongly urges you to avoid time-consuming and costly
disputes with potential contractors and vendors by familiarizing yourself with the rules
and procedures governing competitive bidding. Among the many points to consider are
the following:
* In the award document, the Special Award Condition on “Pre-Award and Procurement
Documents.”
* Read carefully--and have your procurement officer read carefully--the rules
and regulations about competitive bidding of both your state and the Federal
government. Federal purchasing regulations are contained in 15 CFR 24,
which was included in the packet of award documents. If you do not have
copies of these regulations, make certain that you acquire and read them
before you put any items out to bid.
* You may not subgrant any funds or contract with any organization that has
been excluded from, or is ineligible for, participation in Federal assistance
programs. The Federal Excluded Parties System can be accessed at
www.epls.gov.
* When you purchase any item or service as part of the grant project, be certain that
you follow all Federal procurement guidelines, as well as any state guidelines and
procedures to which your organization is subject.
* Take special care to make clear to prospective bidders the code of standards
they are to follow, as spelled out in the OMB circular.
* All procurement transactions must be handled competitively. Practices that
may result in restrictive bidding include the following:
o placing unreasonable requirements on prospective bidders;
o requiring unnecessary experience or excessive bonding;
o engaging in organizational conflicts of interest; and
o specifying a brand name product, or describing the item to be procured in
such a way that all but one supplier are excluded.
** Specifications are best set forth in terms of functions to be performed or the
performance required. Specifications probably are restrictive if they specify how a
given function must be carried out and only one potential supplier does it that way.
Copying specifications supplied by a vendor is almost certain to provoke a bid
protest unless that vendor is excluded from bidding. A bid protest can result in a
time-consuming, lengthy delay in completing your grant project and may cause a
delay in your ability to draw grant funds. Awarding a contract to the low bidder
does not "prove" that restrictive bid specifications were not used.
* Maintain detailed records relating to all procurement. Be especially careful
to document:
o the rationale for the procurement,
o the reason why a particular bid was rejected, and
o the reason why a particular bid was accepted.
* In the event of a protest on any bid specification, make certain that you are
aware of all the local administrative remedies available to you within your
organization and state for resolving bid protests.
Please do not automatically refer bid protests to the Federal government for resolution.
The Federal government limits its role in resolving bid protests to cases in which
violations of Federal law or regulations have occurred, and/or the recipient's organization
has failed to review the complaint properly.
It is your responsibility to learn what you can and cannot do with regard to bidding
procedures.
Quarterly Performance Reports (sometimes called Quarterly Technical Reports) are due
at PTFP within thirty days after the end of each calendar quarter. The Reports let PTFP
and NIST follow your progress in completing your project. Your report should provide
updates and revisions to the Project Schedule and activities accomplished, brief
summaries of meetings, copies of status reports regarding the work of consultants,
copies of planning studies, and so on.
The dates the Quarterly Performance Reports are due at PTFP are as follows:
For the Quarter Your report is due at PTFP
October 1 to December 31 no later than January 31
January 1 to March 31 no later than April 30
April 1 to June 30 no later than July 31
July 1 to September 30 no later than October 31
The Project Schedule submitted at the start of the project should serve as the matrix for
your Reports whether prepared online through PORTS or on paper. As shown in the
sample below, if dates on your Schedule are not met, you should show a revised date in
the column provided with an explanation for any substantial revision in the narrative.
Reports submitted on paper should show the complete PTFP grant number, be identified
as a Quarterly Performance Report, and state the reporting period. Reports are expected
to include the following:
* Comparison of actual accomplishments during the reporting period with the
goals established in the Project Schedule for that reporting period.
* Description of any problems that have arisen or reasons why the established
goals have not been met.
* Actions taken to remedy any failures to meet goals.
While the Schedule and narrative should reflect the current status of the project, NTIA is
not seeking a complete history of the project in each quarterly report. When you address
pending issues from prior quarters, you should condense the prior information and
emphasize the updated material.
Using the format shown here will help you, your Program Officer, and your Grants
Specialist follow your progress in completing the project.
Sample Quarterly Performance Report
Anytown Foundation, Inc. NTIA/PTFP Grant No. 99-99-N99999
Anytown, State
Quarterly Performance Report
Period Ending December 31, 20XX
Prepared January 19, 20XX
Performance Report Summary:
Although there have been slight delays, the project is essentially on schedule, and we have every
expectation that it will be completed by the end of the Grant Award Period. The initial meetings
of the Advisory Committee were very productive and have gotten the whole project off to a good
start.
Original Revised Completed
Milestone Date Date Date
Project start date 10/01/XX 10/01/XX
Submit Project Schedule 10/08/XX 10/09/XX
Prepare RFPs for consultants 10/15/XX 10/15/XX
Request proposals from consultants 10/19/XX 10/18/XX
Develop survey methods 10/22/XX 11/02/XX
First meeting of the Advisory Committee 11/08/XX 11/15/XX 11/10/XX
Open proposals from consultants 11/19/XX 11/20/XX
Special Award Condition: Consultants 11/24/XX 11/22/XX
2nd meeting of the Advisory Committee 12/12/XX 12/12/XX
Award consultants’ contracts 12/15/XX 12/14/XX
First meeting with technology consultant 12/28XX 01/03/XX
Distribute survey materials 01/08/XX
Submit Quarterly Performance Report 01/21/XX
3rd meeting of the Advisory Committee 02/12/XX
Review and analyze survey results 04/10/XX
4th meeting of the Advisory Committee to discuss
survey results 04/15/XX
Mail SF-269 to NIST 04/19/XX
Submit Quarterly Performance Report 04/19/XX
Schedule additional meetings with all parties 04/19/XX
Begin onsite visits 05/19/XX
Review technological options with technology
consultant 06/15/XX
Submit Quarterly Performance Report 07/17/XX
Review and analyze research findings and
technological recommendations 08/10/XX
Begin drafting Final Report 08/14/XX
Advisory Committee meeting to approve Final
Report 09/20/XX
Grant Award Period ends 09/30/XX
Submit Quarterly Performance Report 10/16/XX
Mail final SF-269 to NIST 10/16/XX
Submit Close-Out, including Final Report 12/15/XX
[signature]
Richard Who
Executive Director
Note: If you prepare your Report on paper, the summary may be placed after the
milestones, just above the signature. Send two copies of the Report to your Program
Officer at the address shown here.
You must submit a Financial Status Report (SF-269) to NIST for the six-month periods
ending March 31 and September 30, or any portion thereof whether there was any
financial activity or not. The reports are due no later than April 30 and October 31,
respectively. A final Financial Status Report must be submitted within ninety days after
the expiration of the Grant Award Period. If your PTFP Grant Award Period began on
October 1, your first Financial Status Report is for the period ending March 31.
Please note carefully: Failure to submit the required financial status reports on time or
to respond promptly to requests or inquiries from NIST may result in (1) the temporary
suspension of the ability to draw down grant funds or (2) suspension of the Grant Award
for non-compliance with the terms and conditions of the grant
Financial Status Report forms (SF-269) are included in your award documents.
Completed reports should be sent to NIST at the address shown here. Questions
about completing the SF-269 should be directed to your Grants Specialist.
Amendments of the approved planning budget can be made only with prior written
approval from NIST. It should be understood that neither the Federal grant amount nor
the Federal percentage can be increased. No matter what anyone may say, if you do not
receive written approval from NIST, the request for a budget amendment has not been
approved.
Requests for amendments must be submitted in writing to PTFP through PORTS or on
paper. The request cannot be combined with a Quarterly Performance Report, an
extension request, nor any other submission. The request should state clearly what
changes you wish to make and the reasons for them. We suggest that you first call your
Program Officer and discuss the need for amending the grant award. If submitted on
paper, the request should be clearly identified as an Amendment Request.
Amendments may be approved if they are integral to, and within the scope of, the
originally approved project. Requests will be reviewed to determine whether the
amendment is necessary for successful completion of the approved planning objectives.
Requests will be reviewed by PTFP and a recommendation made to NIST, which will
make the final decision.
Your written amendment request should contain a statement along the following lines:
The changes requested in this amendment will be accomplished at no additional cost to the
Federal government. Any increase in the total cost of the project caused by the requested
amendment will be covered from local funding sources.
Or:
We have tentatively identified some funds within the grant that may be available to help
with this change, but we are prepared to pay any increase in the total cost of the project
from local resources and the change will be accomplished at no additional cost to the
Federal government.
When an Amendment Is Not Required
Adjustments for minor changes — up to 10% of the budgeted line item amount — do not
require an amendment. Please contact your Program Officer if you have any questions.
Unauthorized Expenditures
Please note that, after completing the approved planning activities, you are NOT
authorized to spend any remaining Federal funds. A planning activity expense that does
not appear in the award document or has not been the subject of an approved
amendment will be removed from the project by NTIA/PTFP at close-out. If this occurs
you may be required to refund Federal funds previously paid to your organization.
The Grant Award Period is the time during which your organization can obligate Federal
funds to complete the approved project. The Grant Award Period for your grant appears
on the first page of the award document and is normally for one year. All Federal funds
must be obligated and all planning activities completed by the end of the Grant Award
Period.
A request to extend the Grant Award Period may be granted for good cause or unusual
circumstances. Requests must be submitted in writing to PTFP through PORTS or on
paper. The request cannot be combined with a Quarterly Performance Report, an
amendment request, or any other submission. An extension request should reach
PTFP at least three weeks before the end of the Grant Award Period. This will allow your
request to be given full consideration before the Grant Award Period expires. Before
submitting your request, we suggest that you call your Program Officer and discuss the
need for an extension. If submitted on paper, the request should be clearly identified as
an Extension Request.
Your request should be supported by a full explanation of what has happened to make
an extension necessary. Generally PTFP looks for causes beyond the grantee's control,
such as failure of a contractor to meet delivery dates, and it may request supporting
documentation (copies of correspondence, etc.) to accompany the request. It does not
look favorably on simple inactivity on the part of the grantee. After reviewing it, PTFP
forwards the request to NIST with a recommendation for approval or denial.
If you do not receive written approval from NIST, the request for an extension has not
been approved.
Extensions of the Award Period for a planning project will usually be for three or six
months.
Non-profit organizations, government agencies, Indian tribes, and educational institutions
expending more than $500,000 in Federal funds from all sources during a one-year
period are required to have an audit conducted in accordance with Federal guidelines as
stated in OMB Circular A-133, dated June 30, 1997. (If you do not have a copy, you can
get one by going to www.whitehouse.gov/omb and clicking on <Circulars>.) These audits
are performed in one of two ways. An NTIA/PTFP-specific audit may be performed if the
organization receives Federal funds solely from NTIA. If the organization receives funds
from more than one Federal source during the year that the audit is conducted, an
organization-wide audit must be performed. Note that Corporation for Public
Broadcasting (CPB) funding is not considered a Federal source.
In brief, OMB Circular A-133 requires that all such recipients obtain regular audits,
preferably annually, but at least once every two years. Copies of the audits must be
provided to each Federal agency that provides funds to your organization. Copies for the
Department of Commerce should be sent to the following address:
Mr. William F. Bedwell. Jr.
Office of Audits - Regional Audits
Office of Inspector General
U.S. Department of Commerce, Suite 2342
401 West Peachtree Street, NW
Atlanta, GA 30365
No matter which Federal agency is officially to receive the audit, all PTFP grant recipients
should send a copy of the audit transmittal letter to their NIST Grants Specialist.
Public broadcasters should note that audits performed in response to CPB qualification
requirements will not necessarily conform to the Federal government auditing standards
required by Circular A-133. The CPB requires a "standard" financial statement audit.
While such an audit will certainly serve as the basis for the A-133 audit, further tests of
the accounting records will have to be completed in order to bring the audit into
compliance with A-133. We urge you to review the A-133 requirements with your
accountant as early as possible.
** Grantees should review Section D of the Department of Commerce Financial
Assistance Standard Terms and Conditions. Section D discusses audits. All
questions about audits should be directed to NIST.
The most important thing to come out of your planning project is a Final Report on the
results obtained. Its submission is part of closing out your grant, but it needs to be
considered and prepared before the end of the Grant Award Period to be sure that
everything needed has been completed. The report should contain the following
elements:
■ An executive summary covering the major findings and conclusions. (It is worth
noting again that it is perfectly acceptable for a planning project to conclude that a
station or nonbroadcast facility should not be constructed.)
■ A detailed explanation of the planning process you used.
■ A detailed discussion of the results and conclusions of the planning process. The
Report should answer the questions given in PTFP’s guidelines for preparing
broadcast and nonbroadcast planning project applications.
■ Here are the questions PTFP expects broadcast planning projects to answer:
a. What will be the mission/purpose of the station? How was that decided?
b. What types of station ("Alternative Technologies") were considered – Low-Power
FM, full-power AM or FM, repeater with local origination capability? What are the
pros and cons for each type in your situation? Which type did you choose? Why?
c. Will the station be built by and licensed to your organization or another
organization? If the latter, the Final Report should document that the organization
is (i) eligible to apply for and receive a Construction Permit for the proposed
station from the Federal Communications Commission (FCC), and (ii) committed
to the construction and long-term support and operation of the station.
d. If the proposed licensee is not experienced in broadcasting, what source of
broadcast expertise will the licensee have available to assist it in the operation of
the station?
e. How will the licensee oversee the operation of the station? Will the station have an
advisory board or committee? How will its members be chosen? Is there to be any
participation by the general public?
f. What financial resources will be available to support the cost of (i) constructing the
proposed station and (ii) the long-term operation of the completed station?
Documentation — with dollar-commitment estimates, even if conditional — from
possible supporters of both types of expense should be included with the Final
Report.
g. Have sites been found for studios, offices, the transmitter, and a tower? Does the
proposed licensee own them or will it buy or lease them? If the latter, does it have
a commitment from the present owner(s) to sell or lease? If sites have not been
found, what is being done to find them?
h. What engineering resources will be available for (i) the construction of the
proposed station and (ii) the long-term maintenance of station equipment for its
operation and continued useful life?
i. What staffing plans have been developed? How many and which positions will be
paid? How many and which will be volunteer positions? Will there be any student
positions? How many and in what capacity? If experienced professionals will not
be hired, how will the staff be trained?
j. What programming plans have been developed?
k. What evidence is there that the population of the expected coverage area is
interested in the proposed station?
l. What evidence is there that other organizations in the coverage area would
welcome the station and see it as a potential aid to their work? Have they pledged
any type of support?
m.If you requested Priority 1A or 1B for your project, is the proposed coverage area
currently unserved by a public radio or television station?
n. If you requested Priority 4A for your project, will the proposed station address
underserved needs in the projected coverage area in a way that significantly
differentiates its service from what is already available?
o. When will an application for a Construction Permit be submitted to the FCC?
■ Here are the questions PTFP expects nonbroadcast planning projects to answer:
a. What the comprehensive needs assessment determined.
b. The precise goals and objectives for the proposed nonbroadcast system, flowing
from the needs assessment.
c. What types of nonbroadcast technical systems ("Alternative Technologies") were
considered — fiberoptic interconnection, satellite distribution, datacasting on a
portion of a digital television signal, educational broadband system, other
microwave or web-based internet services? What are the pros and cons for each
type in your situation? Which type have you selected? Why?
d. Project staffing. If your project is for distance learning, you should have
determined how many staff would have to be dedicated to the proposed system in
order to operate, maintain, and administer it. Staff training also fits under this
heading. You should show how you intend to provide sufficient – and continuing –
training to the faculty who will be using the system, either as teachers or as
mentors.
e. What sort of advisory group is desirable to ensure that the nonbroadcast distance
learning system will continue to serve the needs of its users? How will it be
formed?
f. What sources of funding will be available for two purposes: (i) to provide the
non-federal share of a PTFP project implementation proposal, if relevant, and (ii)
to support the eventual nonbroadcast system adequately over the long term?
g. If Federal Communications Commission authorization is required to construct your
facility, when will an application for a Construction Permit be submitted to the
FCC?
The documentation to close-out a PTFP grant must be submitted within 90 days of the
completion of the grant project or the expiration of the Grant Award Period, whichever
comes first. As the closing date of your award approaches, you will receive a reminder
email from NTIA/PTFP. It will direct you to the Close-Out Requirements section of this
website, which contains complete instructions to assist you in preparing your close-out. If
you complete your project early, you should proceed to that website without waiting for
the reminder because the 90-day close-out period starts at the end of the month in which
your project is completed. Failure to submit your Close-Out within the 90-day period puts
your project out of compliance with the terms and conditions of the award and can result
in termination of the award, establishment of an Account Receivable for all Federal funds
disbursed for the award, and denial of future grants to your organization.
Click here for Close-Out instructions and guidance.
Your organization’s responsibility to the Federal government through the Department of
Commerce does not end when NIST informs you that your Close-Out has been
accepted. For details of the post-project responsibilities, click here.
NOTICE
We have estimated that each response to this collection of information will take on average 64
hours for planning grant recipients to prepare the project schedule, the quarterly performance
reports, and the final report. Our estimate includes the time to read the instructions, look through
existing records, gather and maintain required data, and actually complete and review the
response. If you have any comments on this estimate or on how we can improve the collection
and reduce the burden it causes you, please write to the Office of Policy Coordination and
Management, NTIA, Room 4892, Department of Commerce, Washington, DC 20230. Your
comments will also be accepted via the Internet if you send them to ptfp@ntia.doc.gov. You are
not required to respond to a collection of information sponsored by the Federal government, and
the government may not conduct or sponsor this collection, unless it displays a currently valid
OMB control number or if we fail to provide you with this notice.