HomeApplication ProcessRules and PoliciesAwarded ProjectsFor GranteesReporting RequirementsClosing a ProjectsFederal Interest PeriodPORTSHow to use PORTSTelevisionRadioDistance Learning and NonbroadcastAround the CountryContact PTFP Reporting Requirements
""

Introduction

You should read your Department of Commerce Financial Assistance Award (CD-450) very carefully and keep it handy throughout the Grant Award Period. It includes information that does not appear here.

You may want to bookmark this website so that it is easy to find while your project is being completed. It takes you through preparing reports that have to be submitted during the life of the grant, explains how to request an amendment or extension of your grant if you need one, and then takes you to the process of closing out the grant. Everyone involved with the project in your organization should know that this information is here and how to find it. (If you wish, you can request a printed copy of this material from PTFP.)

Please note that failing to provide required information on time and in full not only creates unnecessary problems for your organization, but also puts it out of compliance with the terms and conditions of the grant award. Being out of compliance can result in suspension of payments, termination of the award, establishment of an Account Receivable for any Federal funds paid out to your organization, and denial of grants to your organization in the future.

To help you keep track of PTFP deadlines, we suggest that you keep a printed copy of your Construction Schedule handy to refer to as a kind of checklist as the project proceeds.

Do not hesitate to contact your PTFP Program Officer whenever you have questions.

Here is what is covered in this section:

Housekeeping Items

  • Where to Send Reports and Requests
  • Correct Names and Addresses
  • Duplicate Copies and Grant Numbers
  • Grant Payments
  • Construction Schedule

    Special Award Conditions

  • Initial Liens
  • Insurance Coverage
  • Site Rights
  • FCC Authorizations
  • Financial Management System
  • Internal Revenue Service
  • Consultants/Contractors
  • Competitive Bidding

    Quarterly Performance Reports

    Financial Reports

    Labeling Equipment

    Amendments

    Extension of the Grant Award Period

    Audit Requirements

    Close-Out Requirements

    Post-Project Responsibilities

    Planning Grants



    Where to Send Reports and Requests
     
    While completing your grant, you will have contact with PTFP and the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD). Both are part of the Department of Commerce.

    Some of the reports and requests you have to prepare for your grant should be addressed to your PTFP Program Officer and others to your NIST/GAMD Grants Specialist. The names of your grant's Program Officer and Grants Specialist are listed in the Special Award Conditions of your Financial Assistance Award (CD-450). Following the directions given here will help to ensure that the appropriate person sees your submissions as soon as possible.

    Your PTFP Program Officer should be the initial contact for all programmatic aspects of your grant award. The reports and other documents you submit to NTIA/PTFP are:

      Construction/Planning Schedule   Quarterly Performance Reports
      Insurance Certification   Amendment Request
      Lien   Extension Request
      Site Rights Certification   FCC Documents

    Documents should be addressed to:
    
             [Program Officer's Name]
              NTIA/PTFP
              Room 4096
              U.S. Department of Commerce
              1401 Constitution Avenue, NW
              Washington, DC 20230
    
    ______________________

      The National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD) is the Federal Grants Office and is responsible for all administrative and financial reporting aspects of your grant. You will receive official approval for certain changes in the grant from NIST/GAMD. The following should be submitted there:
    • Financial Status Report (SF-269 Long Form)
    • Signed copies of Financial Assistance Award (CD-450)
    • Signed copies of Amendment to Financial Assistance Award (CD-451)
    • Documents to comply with a Special Award Condition on your Financial Management System (if imposed)
    • Executed liens (those that have been filed and stamped in a recording office in your state)
    Documents should be addressed to:
    
    	[Grants Specialist's Name]
    	National Institute of Standards and Technology
    	 The Chief Financial Officer
    	Grants & Agreements Management Division
    	100 Bureau Drive, Mail Stop 1650
    	Gaithersburg, MD  20899-1650
    	 
    Correct Names and Addresses
      Please make sure that the address on file with PTFP and NIST/GAMD is current and correct. If you did not do so during the application process, please supply both with a valid street address for your organization.

    If your organization changes the person named in the Financial Assistance Award (CD-450) as the Contact responsible for administering the grant, be sure to inform PTFP and NIST/GAMD of the change immediately and in writing.

    Duplicate Copies and Grant Numbers
      Except for lien documents, please get in the habit of submitting to PTFP all reports, supporting documentation, and other items that may be requested in duplicate!
      Please always put your full grant number--e.g., 99-99-N99999 - on anything you send to PTFP or NIST/GAMD.

    The Construction Schedule is the timetable of how you plan to complete your project. All equipment must be installed and operational, and all expenditures approved for the project must be incurred by the end of the Grant Award Period. As you prepare your Construction Schedule, you should anticipate and allow for normal delays that may happen in a project of your kind.

    As you prepare your Construction Schedule, please keep in mind that your project was funded because of the urgency of need expressed in your application. Completion of the project should reflect the same sense of urgency. Your organization is expected to begin work on the project promptly and to complete it within the Grant Award Period specified in the award document.

    NTIA has found that the greatest single cause of the inability of grantees to complete their projects within the authorized Grant Award Period is a delay in the start of equipment procurement. If you anticipate a delay of more than a few weeks while equipment is researched for the writing of bid specifications, please discuss the matter with your Program Officer as you prepare your Construction Schedule.

    You can prepare your Construction Schedule online through PORTS . It is due at PTFP thirty (30) days after the start-date on page 1 of your grant award (CD-450). If you prepare it in hardcopy rather than in PORTS, please send two copies to PTFP.

    Your Construction Schedule must be sufficiently detailed to allow PTFP to be sure that all necessary steps to complete the project are planned and scheduled and also to allow it to track progress as the project goes forward. If you prepare your Construction Schedule online, PORTS provides a matrix to be filled in. The Construction Schedule should contain projected dates for the following items:

    • When advertising for bids on equipment items will begin.

    • The deadline for the receipt of bids.

    • When purchase orders/contracts for equipment will be issued.

    • When installation of equipment will begin.

    • When installation will be completed.

    • When testing of the grant equipment will begin.

    • When testing will be completed.

    • When all equipment authorized in the grant will be operational.

    • When you expect to submit requests for payment, with an estimate of the amount to be requested in each payment.

    • When the following documents will be submitted to NTIA/PTFP if required by a Special Award Condition in the award document:


      • The initial lien.

      • Evidence of insurance.

      • Attorney's letter certifying the site rights (due six months after the start of the Grant Award Period).

      • Auditor's certification regarding financial management system (This one goes to NIST/GAMD).

      • Any document(s) needed to comply with a Special Award Condition that is unique to your project

        (There may be other Special Award Conditions, depending upon the circumstances of your project. If so, they may require your action by a specified date. Be sure these response dates are included in your Construction Schedule.)


    • When the Close-Out will be submitted.

    • Any other important information affecting the speedy completion of the project.

    As noted above, you can prepare your Construction Schedule online through PORTS. If you prepare it in hardcopy, please submit it to PTFP in duplicate.

    As noted in the Introduction, above, we recommend that you keep a printed copy of your Construction Schedule at hand to refer to as a kind of checklist as the projects prodeeds.


    Sample Construction Schedule

    Anytown State University NTIA/PTFP Grant No. 99-99-N99999
    Anytown, State Station WPS (FM)

    CONSTRUCTION SCHEDULE

    Project start date 10/01/XX  
    Mail construction schedule 10/08/XX  
    Prepare specs for transmitter 11/05/XX  
    Prepare specs for studio equipment 11/19/XX  
    Request for bids on transmitter 12/14/XX  
    Mail initial lien 12/16/XX [include only if specified in award document]
    Mail insurance certification 12/16/XX [include only if specified in award document]
    Request for bids on studio equipment 12/21/XX  
    Open bids for transmitter 1/18/XX  
    Mail Quarterly Performance Report 1/21/XX  
    Open bids for studio equipment 2/04/XX  
    Award transmitter contract 2/08/XX  
    Award studio equipment contract(s) 2/22/XX  
    Special Award Condition: Site Rights 3/20/XX [include only if specified in award document]
    Mail SF-269 Long Form to NIST/GAMD 4/12/XX  
    Mail Quarterly Performance Report 4/19/XX  
    Begin studio equipment installation 4/19/XX  
    First payment request: $20,000 4/28/XX  
    Studio equipment installation complete 5/19/XX  
    Second payment request: $10,000 5/24/XX  
    Begin transmitter installation 5/31/XX  
    Third payment request: $40,000 6/07/XX  
    Mail Quarterly Performance Report 7/17/XX  
    Transmitter testing begins 7/26/XX  
    Transmitter installation completed 8/18/XX  
    Final payment request: balance 8/23/XX  
    Grant Award Period ends 9/30/XX  
    Mail Quarterly Performance Report 10/16/XX  
    Mail Close-Out 12/15/XX  

    Special Award Conditions


    Your award document may contain Special Award Conditions that require the submission of documents to NTIA/PTFP before Federal funds are released to your organization. Such Special Award Conditions are generally printed at the end of the award document. They usually begin: "No funds from the Federal share of this grant award shall be released until the recipient has submitted to NTIA...".

    The most common Special Award Conditions relate to liens, insurance coverage, site rights, FCC authorizations, your organization's financial management system, the Internal Revenue Service, and consultants and/or contractors. These are discussed in order below, but other Special Award Conditions may be included in the Grant Award as circumstances require. Please note that the Department of Commerce may impose Special Award Conditions at any time during the grant award period.

    For each Special Award Condition:

    Note that many of the documents required to meet the Special Award Conditions can be submitted electronically as attachments in PORTS, via e-mail, or by fax to PTFP (202-482-2156).




    NTIA/PTFP retains a priority reversionary interest in all equipment acquired pursuant to the project. The interest extends from the beginning of the Grant Award Period through a ten-year period following the completion of the project. Some grantees are required to file an initial lien for their projects. If one is required, Federal funds cannot be released until the lien has been submitted, approved, filed, and a certified copy returned to NIST/GAMD.

    When an initial lien is required for a PTFP project, it is usually requested in a Special Award Condition placed in the award document and stated in language similar to the following:

      No funds from the Federal share of this grant award shall be released until the recipient has executed and recorded a document establishing that the Federal government has a priority lien on any facilities purchased with funds under this award during the period of continuing Federal interest.

    Most grant recipients use a UCC-1 (Uniform Commercial Code) financing statement. A chattel mortgage may also be used. UCC-1 forms differ slightly from state to state. They are usually available from an attorney, a bank's loan department, or an office supply store.


    Completing the UCC-1
    Enter your organization's name and address as the "Debtor". Enter the following in the section for the "Secured Party":

    
         NTIA/PTFP
         Room 4812
         U.S. Department of Commerce
         1401 Constitution Avenue, NW
         Washington, DC 20230
    	

    In the section designated for the description of the items covered by the lien, enter the following:

      This financing statement covers all equipment to be acquired under National Telecommunications and Information Administration Grant No. [enter complete grant number; e.g., 99-99-N99999]. A copy of the project's equipment list is attached and is incorporated into this lien by reference. The term of this priority lien shall extend for a period of ten years following [fill in the project expiration date from the face sheet of the award document], during which time the Federal Government retains a priority reversionary interest in the equipment on the attached list.

    Attach a copy of the approved equipment list from your award document. The lien document should be signed as the "Debtor" by your organization's Certifying Representative (if a signature is required by your state) and sent to PTFP at the following address:
    
    	  [Name of your organization's PTFP Program Officer]
    	  NTIA/PTFP
    	  Room 4812
    	  U.S. Department of Commerce
    	  1401 Constitution Avenue, NW
    	  Washington, DC 20230
    	  

    The PTFP Program Officer will review the lien and forward it to the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD). (Note that the lien form must be sent to PTFP before filing, even if your state's form does not include a space for the Secured Party to sign it.) NIST/GAMD will sign the lien document for the "Secured Party" and return it to you. You must then file it at recorder(s) office(s) in the jurisdiction(s) where the project equipment will be located and where your headquarters are located, if different.

    Original lien forms, with the recording office's stamp clearly visible, must be returned promptly to:

    
    	[Grants Specialist's Name]
    	National Institute of Standards and Technology
    	Office of the Chief Financial Officer
    	Grants & Agreements Management Division
    	100 Bureau Drive, Mail Stop 1650
    	Gaithersburg, MD  20899-1650
    		
    Additional Liens
    You may be required to provide revised liens prior to the completion of your project if your grant award is amended to include additional or materially different equipment.

    In many jurisdictions, the lien can be revised by executing an amendment to the original UCC-1. The forms to amend the original filing have different designations in various jurisdictions. In many states, the amendment version is called a UCC-2 or a UCC-3.

    Follow the same procedures to file a revised UCC form as outlined for the initial lien.




    All grantees are required to maintain adequate insurance coverage on the equipment purchased under a PTFP grant so that, in the event of loss, they will be able to continue the project by promptly replacing equipment.

    Some grant awards include a Special Award Condition for insurance coverage. If yours does, your organization must certify that all equipment to be purchased with PTFP funds will be insured. When an insurance certification is required for a PTFP project, the Special Award Condition is usually stated in language similar to the following:

      No funds from the Federal share of this grant award shall be released until the recipient has certified that the grantee maintains protection against common hazards through adequate insurance coverage or other equivalent undertaking, except that, to the extent the grantee follows a different policy of protection with respect to its other property, the grantee may extend such policy to apparatus acquired and installed under the project. The grantee shall certify that it has purchased flood insurance (in communities where such insurance is available) if the facilities will be constructed in an area that has been identified by the Federal Emergency Management Agency as having special flood hazards. Certification shall be in the form of a letter signed by the Chief Executive Officer, Chief Financial Officer, or Risk Manager of the recipient organization.




    As indicated in the section on liens, the Federal government has an interest in PTFP-funded equipment for ten years after the completion of a project. To ensure that inadequate site rights will not hinder a grantee's ability to provide long-term public telecommunications services, NTIA requires grantees to have adequate rights to each site on which such items of major fixed equipment as a broadcast transmitter or a tower are or will be installed. Some grant recipients are required by NTIA/PTFP to provide evidence of leases or ownership of such sites.

    When site rights certification is required for a PTFP project, it is requested in a Special Award Condition placed in the award document and stated in language similar to the following:

      No funds from the Federal share of this grant award shall be released until the recipient provides to NTIA an opinion letter from its attorney describing the ownership or leasehold interest the recipient has in all sites on which the recipient will locate major fixed equipment, such as broadcast transmitters or towers (whether or not funded by this grant project). The attorney's opinion letter shall comply with the requirements provided by the NTIA. If the recipient fails to submit the required certification letter by [date], this grant award may be terminated.

    As stated in the Special Award Condition, if the required attorney's certification letter regarding the site rights is not submitted to NTIA/PTFP in final form by the deadline stipulated, the grant award may be terminated. Grantees should work with their local attorneys to develop acceptable lease or ownership agreements. NTIA expects grantees to have at least the following for a ten-year period at each site involved:

    1. The right--whether by fee simple title, appropriate long-term lease, or the option or rights of renewal to obtain the same--to occupy the site(s).


    2. The right to construct, maintain, operate, inspect, and remove the project equipment without any impediments in the site contract(s) or local zoning laws, or any other known impediments.

    In addition, nothing under local law or enforceable contract should prevent the Federal government from entering the property and reclaiming or securing grant-funded property.


    Exceptions
    The letter should address specifically any exceptions to the general provisions above and to the statements in the sample letter below. It should identify and fully explain any circumstances that support the conclusion that those exceptions do not materially interfere with the grantee's and the Federal government's ability to protect the grant property and the continued operation of the project for the duration of the Federal interest period.

    If your rights are subject to restrictions that might prevent occupancy for the full ten-year period, your counsel must certify that the Federal interest in the equipment is fully protected. For example, a lease may allow the lessor to terminate occupancy in certain events (non-payment or other default), or its term may be less than the full ten years (without a renewal clause). In these situations, counsel must certify that:

    (a) If the lease allows the lessor unilaterally to terminate the lease for cause and evict the lessee, the lessor must provide adequate advance notice in writing of such action. Preferably, the lease will provide reasonable opportunity to "cure" problems, and sufficient time to relocate the facilities without a break in the broadcast service. The requisite period of time may vary with the nature of the facility and local real estate market, but the advance notice period would typically be 60 to 120 days.
    (b) A lessor's lien, if any, on the grant-funded property remains subordinate to the Federal lien on the property. A lessor's right, if any, to remove property in an eviction situation is subject to an obligation to hold and to protect that property for disposition by the Federal government.
    (c) If the lessor has rights that exceed those outlined in (a) or (b), above, or has other rights that interfere with the operation of the project (such as termination of needed services), local law or enforceable contract ensures that these rights are exercised reasonably. Reasonableness includes adequate prior notice to the grantee and cooperation or consultation with the grantee to minimize damages.

    A SUGGESTED LETTER OF CERTIFICATION:

    (ATTORNEY LETTERHEAD)

    NTIA/PTFP Grant No.:__________

    I, (attorney name), certify that I am legal counsel to (grantee name) and that it has major fixed equipment at the following site(s):

    Site     Use of Site Status Lessor Name
          [Transmitter, microwave, etc.] [Own, lease,option]  

    I recognize that the Federal Government has an interest in the project from the award date through a period ten years after project completion. For [each of] the above site[s], I certify that, during the Federal interest period:

    1. The grantee has the right by [fee simple title, appropriate long-term lease, or the option or rights of renewal to obtain the same] to occupy the above site[s]


    2. The grantee's right to construct, maintain, operate, inspect, and remove the project equipment is not subject to any impediments in the site contract[s] or local zoning laws, or any other known impediments.


    3. Under local law or enforceable contract, nothing prevents the Federal government from entering the property and reclaiming or securing grant-funded property.

    [Discussion of any possible exceptions].

    Signature of legal counsel


    We would like to emphasize what is NOT necessary. NTIA does not require that the recipient's attorney conduct a title search. Nor does NTIA expect that the attorney will perform research into the real estate laws and zoning regulations of the communities in which the project's major fixed equipment is located. In fact, no special research should be called for to satisfy this Special Award Condition. NTIA merely expects that the attorney will read carefully the site document in question and, based upon that reading, determine whether the document conforms to NTIA's requirements. Attorneys may, if they choose, state the limitations of their research in the opinion letter.





    If your project requires authorization from the Federal Communications Commission before it can be built and you did not have that authorization in hand when your PTFP application was negotiated, a Special Award Condition was imposed stating that no Federal funds can be released until the necessary authorization has been issued and copies supplied to NTIA/PTFP. When a project is very large and requires a number of FCC authorizations, the Special Award Condition may be worded to allow Federal funds to be released for different portions of the project as the various authorizations are issued by the Commission.

    You should keep your PTFP Program Officer informed about the status of your FCC application and any actions the Commission takes apart from issuing a required authorization. Please note, however, that NTIA/PTFP cannot intervene on behalf of your organization with the FCC.


    This condition--imposed by the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD)-- requires that a Certified Public Accountant certify that your organization's financial management system meets the requirements and standards prescribed in 15 CFR Part 14, Subpart C, Section 14.21. The certification should be sent to your Grants Specialist in NIST/GAMD, not to your PTFP Program Officer. (See under "Housekeeping Items," for the address of NIST/GAMD.)



    If the Internal Revenue Service (IRS) had not ruled on your organization's non-profit status when you submitted your PTFP application or when that application was negotiated, a Special Award Condition was imposed:

      No funds from the Federal share of this grant shall be released until the recipient has submitted to the NTIA a copy of the Internal Revenue Service certification of its non-profit status.

    To meet this condition, send your Program Officer two copies of the IRS certification.




    This condition is imposed only on planning grants. Most such projects make use of consultants or contractors to perform some or all of the studies required for the project. Two copies of the resume(s) and/or proposal(s) of any such consultants and contractors must be submitted to PTFP for approval before the project may proceed. The materials should be sent to your PTFP Program Officer.

    Please note that this condition is in addition to the consultant/contractor requirement stated in the applicable OMB circulars.




    All acquisitions made as part of an NTIA/PTFP grant must be done through open competitive bidding. As the Office of Management and Budget puts it, "All procurement transactions shall be conducted in a manner to provide, to the maximum extent practical, open and free competition." NTIA strongly urges you to avoid time-consuming and costly disputes with potential contractors and vendors by familiarizing yourself with the rules and procedures governing competitive bidding. Among the many points to consider are the following:

    • In the award document, Special Award Condition Number 10 for planning projects and Number 11 for construction projects.

    • Read carefully--and have your procurement officer read carefully--the rules and regulations about competitive bidding of both your state and the Federal government. Federal purchasing regulations are contained in 15 CFR 24, which was included in the packet of award documents. If you do not have copies of these regulations, make certain that you acquire and read them before you put any items out to bid.

    • You may not subgrant any funds or contract with any organization that has been excluded from, or is ineligible for, participation in Federal assistance programs. The Federal Excluded Parties System can be accessed at www.epls.gov.

    • When you purchase any item as part of the grant project, be certain that you follow all Federal procurement guidelines, as well as any state guidelines and procedures to which your organization is subject.

    • Take special care to make clear to prospective bidders the code of standards they are to follow, as spelled out in the OMB circular.

    • All procurement transactions must be handled competitively. Practices that may result in restrictive bidding include the following:

      • placing unreasonable requirements on prospective bidders;

      • requiring unnecessary experience or excessive bonding;

      • engaging in organizational conflicts of interest; and

      • specifying a brand name product, or describing the item to be procured in such a way that all but one manufacturer are excluded. When a "brand name or equal" description is used, the specifications should state the specific features of the brand name product that bidders must meet.
    ** Specifications are best set forth in terms of functions to be performed or the performance required. Specifications probably are restrictive if they specify how a given function must be carried out and only one manufacturer's equipment does it that way. Copying specifications supplied by a vendor or manufacturer is almost certain to provoke a bid protest unless that vendor or manufacturer is excluded from bidding. A bid protest can result in a time-consuming, lengthy delay in completing your grant project and may cause a delay in your ability to draw grant funds. Awarding a purchase contract to the low bidder does not "prove" that restrictive bid specifications were not used.
    • Maintain detailed records relating to all procurement. Be especially careful to document:

      • the rationale for the procurement,

      • the reason why a particular bid was rejected, and

      • the reason why a particular bid was accepted.
    • In the event of a protest on any bid specification, make certain that you are aware of all the local administrative remedies available to you within your organization and state for resolving bid protests.

      Please do not automatically refer bid protests to the Federal government for resolution. The Federal government limits its role in resolving bid protests to cases in which violations of Federal law or regulations have occurred, and/or the recipient's organization has failed to review the complaint properly.
    It is your responsibility to learn what you can and cannot do with regard to bidding procedures.



    Quarterly Performance Reports (sometimes called Quarterly Technical Reports) are due at PTFP within thirty days after the end of each calendar quarter. The Reports let PTFP and NIST/GAMD follow your progress in completing your project.


    The dates the Quarterly Performance Reports are due at PTFP are as follows:

      For the Quarter   Your report is due at PTFP
      October 1 to December 31   no later than January 31
      January 1 to March 31   no later than April 30
      April 1 to June 30   no later than July 31
      July 1 to September 30   no later than October 31

    The Construction Schedule submitted at the start of the project should serve as the matrix for your Reports whether prepared online through PORTS or on paper. As shown in the sample below, if dates on your Construction or Planning Schedule are not met, you should show a revised date in the column provided with an explanation for the revision in the appropriate place.

    Reports should show the complete PTFP grant number, be identified as a Quarterly Performance Report, and state the reporting period. Reports are expected to include the following:

    • Comparison of actual accomplishments during the reporting period with the goals established in the Construction or Planning Schedule for that reporting period.

    • Description of any problems that have arisen or reasons why the established goals have not been met.

    • Actions taken to remedy any failures to meet goals.

    • List of equipment purchased during the reporting period compared with the equipment authorized in the award document. This information should include:

      • brief description of each item,

      • manufacturer and model number,

      • quantity of each item purchased, and

      • cost.

    As indicated, your Quarterly Performance Report should include a list of the equipment purchased through the current quarter compared with the equipment authorized in the grant. Online, PORTS supplies the list. The left-hand column shows what was authorized. You should use the right-hand column to supply information on the equipment actually purchased as you acquire it. The list should be cumulative through the project so that it shows NTIA/PTFP all that has been acquired through the most recent Quarterly Performance Report. If you prepare your Report offline, you should utilize the actual equipment pages from the award document. (See the example below.)


    While the equipment list and narrative should reflect the current status of the project, NTIA is not seeking a complete history of the project in each quarterly report. Information for the current reporting period should be highlighted, which can be done simply with an ***. When you address pending issues from prior quarters, you should condense the prior information and emphasize the updated material. Items on the Construction or Planning Schedule that have been fully completed can be reported simply as "Completed".


    Using the format shown here will help you, your Program Officer, and your Grants Specialist follow your progress in completing the project.




    Anytown State University   NTIA/PTFP Grant No. 99-99-N99999
    Anytown, State Quarterly Performance Report Station WPS (FM)
      Period Ending March 31, 20XX - Prepared April 19, 20XX  

    Construction Schedule Activity   Original   Revised   Completed   Report Remarks
    Project start date   10/01/XX       10/01/XX    
    Mail construction schedule   10/09/XX       10/09/XX   Completed.
    Submitted Amendment Request           10/09/XX   Requested approval to substitute RDAT recorders for the reel-to-reel machines in the Grant Award.
    Prepare specs for transmitter   11/05/XX   11/19/XX   11/16/XX   Completion of specs delayed by illness. No significant effect on project.
    Prepare specs for studio equipment   11/19/XX       11/30/XX   Approval of amendment request to change to RDAT recorders received November 27. Project should still be completed on time.
    Request for bids on transmitter   12/14/XX   12/28/XX   12/24/XX   Completed.
    Mail initial lien   12/16/XX       12/17/XX   Completed.
    Mail insurance certification   12/16/XX       12/17/XX   Completed.
    Request for bids on studio equipment   12/21/XX       12/28/XX   Completed.
    Open bids for transmitter   01/18/XX       01/28/XX   Completed.
    Mail Quarterly Performance Report   01/21/XX       01/21/XX   Completed.
    Open bids for studio equipment   2/04/XX       2/08/XX   Completed.
    Award transmitter contract   2/08/XX       2/15/XX   Transmitter contract awarded to American Transmitter Corp., with delivery expected in 90 days.
    Award studio equipment contract(s)   2/22/XX   2/29/XX   3/01/XX   Slight delay due to amendment request. Contracts awarded to Midtown Electronics, Inc., and Technical Supply Co. Delivery expected in 45 to 60 days.
    Special Award Condition: Site Rights   3/20/XX       3/20/XX   Completed.
    Mail SF-269 to NIST/GAMD   4/12/XX            
    Mail Quarterly Performance Report   4/19/XX            
    Begin studio equipment installation   4/19/XX   4/28/XX        
    First payment request: $20,000   4/28/XX            
    Studio equipment installation complete   5/19/XX            
    Second payment request: $10,000   5/24/XX            
    Begin transmitter installation   5/31/XX   6/14/XX       Start of installation delayed to allow two engineers to take early vacation. Completion should not be delayed.
    Third payment request: $40,000   6/07/XX            
    Mail Quarterly Performance Report   7/17/XX            
    Transmitter testing begins   7/26/XX            
    Transmitter installation completed   8/18/XX            
    Final payment request: balance   8/23/XX            
    Grant Award Period ends   9/30/XX            
    Mail Quarterly Performance Report   10/16/XX            
    Mail Close-Out   12/15/XX            

    Note: The March 4th flood took out a bridge over Yellow Creek leading to the transmitter site. Truck delivery of the new transmitter will be impossible until the bridge is repaired. (Our engineers now have to walk the last mile to the transmitter.) We are in contact with the Highway Department about the situation, and a local National Guard Combat Construction Unit may be able to arrange delivery by helicopter for us if necessary to complete the work on schedule.


    Performance Report Summary:

    Although there have been slight delays along the way, the project is now essentially on schedule, and we have every expectation that it will be completed by the end of the Grant Award Period. The situation with the road to the transmitter site is serious and could result in a project delay. There is still time for the road repairs, however, and talks with the National Guard unit are very positive as to their being able to help us-in fact, they appear eager to do so and hopeful that the Highway Department will be unable to repair the road in time! If all this ends by necessitating an extension of the Grant Award Period, we will advise PTFP at least 30 days before the expiration date and formally request an extension.

    Equipment list is attached.

    [signature]


    Richard Who
    Station Manager

      NOTE: If you prepare your Report in hardcopy and do not have access to computer software and printers that type landscape, use standard length paper and insert your remarks below each Construction Schedule Activity in the Report.

    An example of the equipment list that accompanies a Quarterly Performance Report follows in the link below.





    You must submit a Financial Status Report (SF-269 Long Form) for the six-month periods ending March 31 and September 30, or any portion thereof whether there was any financial activity or not. The reports are due no later than April 30 and October 31, respectively. A final Financial Status Report must be submitted within ninety days after the expiration of the Grant Award Period. If your PTFP Grant Award Period began on October 1, your first Financial Status Report is for the period ending March 31.


    NB: Financial Status Report forms are included in your award documents. Completed reports should be sent to the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD), not to NTIA/PTFP. NIST/GAMD's address is given under "Housekeeping Items."



    You must mark permanently all equipment included in the project to ensure accurate identification and accurate reference to inventory records.

    A non-removable label (or other means of identification) should be attached to the equipment where it can be seen easily. The label should contain your organization's inventory number plus the last five digits of the NTIA/PTFP grant award number.

    Transmission antennas should be assigned an inventory number. It should be posted in the transmitter shelter with an appropriate identification.



    Your organization has been awarded a PTFP grant to purchase a specific number of specific items of equipment (or to do specific planning) at an agreed-upon Total Project Cost. If the project can be completed for less than the cost estimated in the award document, then both your organization and the Federal government have saved money. (Funds returned to PTFP in this way are awarded as grants in subsequent grant rounds.)

    After purchasing and installing all equipment on the approved equipment list (or completing the approved planning activities) you are NOT authorized to spend any remaining Federal funds.

    Similarly, if the approved equipment list includes two Acme 1400's and they actually cost only half of what was expected, you are NOT authorized to buy three or four as part of the grant project.


    Amending an Award
    Changes or additions can be made to the approved equipment list (or planning activities) only with prior written approval from the Department of Commerce through the National Telecommunications and Information Administration (NTIA) from the Director of PTFP. No matter what anyone may say, if you do not receive written approval, the request for an amendment has not been approved.

    Requests for amendments must be submitted in writing to PTFP. The request should be clearly identified as an Amendment Request and should not be combined with a Quarterly Performance Report, an extension request, or any other submission. The request should state clearly what changes you wish to make and the reasons for them. All relevant cost figures must be included. NTIA suggests that you first call your Program Officer and discuss the need for amending the grant award.

    Amendment requests will be reviewed by PTFP prior to issuing written approval or denial. Amendments may be approved if they are integral to, and within the scope of, the originally approved project. Requests that would result in the expansion of the scope of the project as granted usually will not be approved. Requests will be reviewed to determine whether the amendment is the result of changes in engineering approach, desire to implement new technology, or is necessary for the operation of equipment originally approved in the grant.

    Your written amendment request should contain a statement along the following lines:

      The changes requested in this amendment will be accomplished at no additional cost to the Federal government. Any increase in the total cost of the project caused by the requested amendment will be covered from local funding sources.
    Or:  
      We have tentatively identified some funds within the grant that may be available to help with this change, but we are prepared to pay any increase in the total cost of the project from local resources and the change will be accomplished at no additional cost to the Federal government.

    When an Amendment Is Not Required
    NTIA expects that, as a result of the competitive bidding process, there will be differences in manufacturer and/or model number in the equipment purchased versus the equipment approved in the award document. There probably will also be some minor fluctuation in prices. Amendments for these changes are not necessary as long as the equipment purchased is equivalent in quantity and quality to what appears in the award document equipment list. Please contact your Program Officer if you have specific questions.

    Unauthorized Expenditures
    Equipment (or a planning activity) that does not appear in the award document or has not been the subject of an approved amendment will be removed from the project by NTIA/ PTFP at close-out. If this occurs you may be required to refund Federal funds previously paid to your organization.



    The Grant Award Period is the time during which your organization can obligate Federal funds to complete the approved project. The Grant Award Period for your grant appears on the first page of the award document. All Federal funds must be obligated and all equipment must be installed and operational (or all planning activities completed) by the end of the Grant Award Period.

    Extensions may be granted for good cause. Requests for extensions must be submitted in writing to PTFP. The request should be clearly labeled as an Extension Request and should not be combined with a Quarterly Performance Report, an amendment request, or any other submission. An extension request should reach PTFP at least three weeks before the end of the Grant Award Period. This will allow your request to be given full consideration before the Grant Award Period expires. Before submitting your request, NTIA suggests that you call your Program Officer and discuss the need for extending the Grant Award Period.

    Your request should be supported by a full explanation of what has happened to make an extension necessary. Generally PTFP looks for causes beyond the grantee's control, such as failure of a vendor to meet delivery dates, and it may request supporting documentation (copies of correspondence, etc.) to accompany the request. It does not look favorably on simple inactivity on the part of the grantee.

    If you do not receive written approval, the request for an extension has not been approved.

    Extensions of the Award Period will usually be for a minimum of three months and a maximum of one year.



    A Note on Debts to the Department of Commerce

    Please note that if your organization has an outstanding bill from any part of the Department of Commerce that is more than thirty days old, the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD) will not process an extension request until the debt has been satisfied.




    Non-profit organizations, government agencies, Indian tribes, and educational institutions expending more than $500,000 in Federal funds from all sources during a one-year period are required to have an audit conducted in accordance with Federal guidelines as stated in OMB Circular A-133, dated June 30, 1997 (if you do not have a copy, you can get one by going to http://www.whitehouse.gov/omb and clicking on Circulars). These audits are performed in one of two ways. An NTIA/PTFP-specific audit may be performed if the organization receives Federal funds solely from NTIA. If the organization receives funds from more than one Federal source during the year that the audit is conducted, an organization-wide audit must be performed. (Note that CPB funding is not considered a Federal source.)

    In brief, OMB Circular A-133 requires that all such recipients obtain regular audits, preferably annually, but at least once every two years. Copies of the audits must be provided to each Federal agency that provides funds to your organization. The copy of the audit reports to be provided to the Department of Commerce should be sent to the following address:

    
    			Mr. William F. Bedwell. Jr.
    			Office of Audits - Regional Audits
    			Office of Inspector General
    			U.S. Department of Commerce, Suite 2342
    			401 West Peachtree Street, NW
    			Atlanta, GA 30365
    			

    No matter which Federal agency is officially to receive the audit, all PTFP grant recipients should send a copy of the audit transmittal letter to their NIST/GAMD Grants Specialist.

    Audits performed in response to Corporation for Public Broadcasting (CPB) qualification requirements will not necessarily conform to the Federal government auditing standards required by Circular A-133. The CPB requires a "standard" financial statement audit. While such an audit will certainly serve as the basis for the A-133 audit, further tests of the accounting records will have to be completed in order to bring the audit into compliance with A-133. We urge you to review the A-133 requirements with your accountant as early as possible.

    ** Grantees should review Section D of the Department of Commerce Financial Assistance Standard Terms and Conditions. Section D discusses audits.


    You are required to provide PTFP with full close-out documentation for your project within ninety days following project completion or the expiration of your Grant Award Period, whichever comes first. As the closing date of your award approaches, you will receive a reminder email from NTIA/PTFP. It will direct you to the Close-Out Requirements section of this website, which contains complete instructions to assist you in preparing your close-out. If you complete your project early, you should proceed to that website without waiting for the reminder because the 90-day close-out period starts when construction of your project is completed and the equipment is operational.

    It is essential that you maintain careful records throughout the award period and that you respond promptly to the close-out instructions so that you do not encounter unnecessary delays in preparing your close-out materials.

    Click here for complete Close-Out instructions and guidance.

    **Close-out of Planning Projects is discussed below.**



    Your responsibilities to the Federal government through the Department of Commerce do not end when the National Institute of Standards and Technology (NIST), Grants and Agreements Management Division (GAMD) informs you that your close-out has been accepted. As you know, the Federal government retains an interest in the equipment acquired as part of the project for ten years after the close-out is completed. This section summarizes some of the requirements; a full account of them appears in the close-out part of this website.

    Retention of Records
    Grant recipients must keep intact and accessible the following records:
    (1)   A complete and itemized inventory of all public telecommunications facilities under the control of the grantee, whether or not financed, in whole or in part, with Federal funds;
    (2)   Complete and current financial records that fully disclose the total amount of the project; the amount of the grant; the disposition of the grant proceeds; and the amount, nature and source of non-Federal funds associated with the project; and,
    (3)   All records specified in 15 CFR Part 14 (for educational institutions, hospitals and nonprofit organizations) and 15 CFR Part 24 (for State and Local Governments).

    Grantees must mark project apparatus in a permanent manner in order to assure easy and accurate identification and reference to inventory records. The marking shall include the PTFP grant number and a unique inventory number assigned by the grantee.

    Inspections
    Grant recipients must permit inspections at any time during normal working hours by NTIA and the Comptroller General of the United States, or their duly authorized representatives, of the public telecommunications facilities acquired with Federal financial assistance and of any books, documents, papers, and records relating to those facilities.

    Annual Status Reports
    Organizations that have received construction grants from the Public Telecommunications Facilities Program (PTFP) are required to submit an Annual Status Report for every grant project that is in the Federal interest period. By statute, this is the 10-year period during which the Federal government retains a reversionary interest in all equipment purchased under the project. The Federal interest period commences with the project completion date, as established by NTIA/PTFP during the close-out procedure.

    Annual Status Reports are due on or before April 1 in each of the ten years of a grant's Federal interest period. An organization must submit a separate Annual Status Report--with an original signature--for each grant it has in the 10-year Federal interest period.


    Click here for more information about Annual Reports.



    Recipients of Planning Grants are exempted only from those requirements that relate narrowly to the acquisition of equipment. Planning grantees, for example, do not have to submit insurance and site rights certifications, liens, or FCC authorizations. Nevertheless, Planning Grant recipients must meet many other requirements, some of which are the same as those imposed on recipients of Construction Grants.


    Revised Planning Schedule
    The Planning Schedule is modeled on the Construction Schedule, described above, except that the items listed relate to the steps in the specific planning process, timetable, and activities required to meet the objectives of the grant award.

    Your grant application identified your project's major objectives and procedures and provided a preliminary project timetable. NTIA suggests that you reiterate and keep in mind the specific objectives for your project as you revise and outline the planning process, timetable to accomplish your project within the award period, step-by-step procedures, and activities expected to be completed. You should contact your Program Officer if you have questions regarding the Planning Schedule.


    Quarterly Performance Reports
    The Quarterly Performance Reports should follow the format described for Construction Grants above. Planning grant recipients should provide updates and revisions to the timetable and activities accomplished, brief summaries of meetings, copies of status reports regarding the work of consultants, copies of planning studies, and so on.

    Draft Final Report
    Planning grant recipients are required to submit a draft of the Final Report on their planning project forty-five calendar days before the end of the Grant Award Period for review by their Program Officer for consistency with the goals and objectives, activities, Planning Schedule, and budget of the project. The Program Officer will contact you with any NTIA suggestions for revision or other comments intended to improve the quality of your Final Report and help to ensure that it will be accepted.

    Close-Out Requirements
    You are required to provide full close-out documentation to NTIA/PTFP within ninety days after project completion or the expiration of your Grant Award Period, whichever comes first. Click here for complete Close-Out instructions and guidance.




    NOTICE

    We have estimated that each response to this collection of information will take on average 14 hours for construction grant recipients to prepare the construction schedule and the quarterly performance reports and 54 hours for planning grant recipients to prepare the planning timetable, the quarterly performance reports, and the draft final report. Our estimates include the time to read the instructions, look through existing records, gather and maintain required data, and actually complete and review the response. If you have any comments on this estimate or on how we can improve the collection and reduce the burden it causes you, please write to the Office of Policy Coordination and Management, NTIA, Room 4892, Department of Commerce, Washington, DC 20230. Your comments will also be accepted via the Internet if you send them to ptfp@ntia.doc.gov. You are not required to respond to a collection of information sponsored by the Federal government, and the government may not conduct or sponsor this collection, unless it displays a currently valid OMB control number or if we fail to provide you with this notice.
    OMB Approval No. 0660-0001    Expires July 31, 2006